My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-10-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 4:21:39 PM
Creation date
10/20/2011 1:24:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. B. - Page 3 <br />• Developing a comprehensive capital improvement program for existing and <br />recommended future water system facilities and evaluating potential funding <br />scenarios. <br />The plan's objectives will guide selection criteria for CIP projects. Program performance <br />will be annually reviewed by staff during the budget process. <br />The proposed plan includes preliminary forecasts for CIP improvements that may occur <br />beyond the 20 -year timeframe of the plan. It also includes a study of improvements <br />required for future growth for development planning purposes. The costs of forecasted <br />work and system expansion for future growth have been excluded from the proposed <br />budgeting scenario. The plan assumes that system expansion will be funded by <br />developers. <br />Attached, for Council's reference, is the Executive Summary Chapter from the Water <br />System Master Plan. This chapter synopsizes the key technical findings that result in <br />the recommended Capital Improvement Program and Funding Analysis. Figure ES2 in <br />attached summarizes the proposed CIP. The full text of the proposed Water System <br />Master Plan Report is available for review in the Clerk's Office and in the Community <br />Development Department. <br />Engineering staff has updated the Utilities Committee on the progress of the Water <br />System Master Plan twice; on July 27, 2011, when the plan was 90% complete and on <br />September 14, 2011, at 100 %. At those meetings the project's challenges and analysis <br />techniques were discussed and the proposed 20 -year citywide water system Capital <br />Improvements Program (CIP) was presented to the committee. <br />ALTERNATIVES <br />Council may choose not to accept the Water System Master Plan Report and direct staff <br />not to proceed pursuant to recommendations contained therein. Council may also <br />direct staff to reevaluate the findings and resubmit a revised Water System Master Plan <br />Report at a later date. <br />FISCAL IMPACT <br />Staff recommends a program budget plan of $117 million over a 20 year period to <br />implement 47 improvement projects and programs. The 20 -year program budget <br />assumes a 4% annual inflation rate. <br />The Utilities Committee is considering rate increases to fund the proposed CIP program. <br />Current City Water Enterprise Financial Projections estimate customer rate increases <br />between 3.5% to 12% annually to fund system operational costs, debt service, reserves, <br />the Meter Replacement Program, the Conservation Program, and the Capital <br />Improvement Program as recommended in the proposed through fiscal year 2019 -2020. <br />Rates may be annually adjusted by Council as recommended by the Utilities Committee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.