My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-10-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 4:21:39 PM
Creation date
10/20/2011 1:24:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17. B. - Page 15 <br />Executive Summary <br />A6111V000 <br />B11tY <br />N_ . <br />including success in implementing the 20 -year CIP, and the City commitment to review and <br />make needed adjustments of distribution system needs every five years. <br />Improvements needed for future growth are shown separately, since the CIP is assumed to be <br />fully funded by rates, and improvements to meet growth would be developer- funded. <br />trog ra m <br />Included <br />Scenario 1: <br />Baseline <br />CIP <br />addresses <br />highest risk <br />Table <br />in Funding <br />Scenario 2: <br />Add to <br />improve risk <br />management <br />within CIP <br />timeframe <br />Estimated Cost <br />Analysis <br />Scenario 3: <br />Add to address <br />known risks <br />within CIP <br />timeframe <br />- <br />$M (a) <br />Not Included <br />Analysis <br />Beyond <br />CIP <br />Timeframe <br />in Funding <br />Needed <br />to Meet <br />Future <br />Growth <br />.. <br />Cost in 2011 dollars, indexed to a January 2011 ENR CC I of 10.116 for the San Francisco Bay Area <br />The three funding scenarios are described in further detail below. <br />Scenario 1: The baseline CIP includes $27.6 in improvements ($17.3M for capacity, $1.4M for <br />seismic, and $8.9M for renewal /replacement). Funding for this scenario maintains $2M through <br />the Master Plan timeframe of FY 2029/30. When annual funding for this scenario is adjusted to <br />reflect current dollars, this scenario maintains less historical funding levels ($1.4M /year) through <br />the CIP timeframe. This scenario funds new capacity projects at the expense of pipeline <br />replacement, funding only 0.4 miles /year of pipeline replacement. <br />WEST Y O S T ASSOCIATES ES -1 1 City of Redwood City <br />September 2011 Water System Master Plan <br />o\c\369\06-09-01 \wp\mp\05261 0_0ES <br />
The URL can be used to link to this page
Your browser does not support the video tag.