My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Corrpro Companies, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Corrpro Companies, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2011 12:55:02 PM
Creation date
11/7/2011 12:55:02 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Corrpro Companies, Inc.
PROJECT NAME
Cathodic protection for the buried ferrous metal pipeline components of the sanitary sewer collector system in Redwood Shores
RMP File Number
304.5
Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19 11/4/11 <br /> 20 11/5/11 ---Weekend--- <br /> 21 11/6/11 ---Weekend--- <br /> 22 11/7/11 Submit field data report <br /> 23 11/8/11 Project End <br /> Fee Schedule <br /> Consultant shall be paid an amount not to exceed $29,000.00 for the project as follows: <br /> 1. Labor, material, drilling and equipment: $1700 x 15 =$25,500.00 required to install fifteen (15) <br /> anode stations. <br /> 2. Labor and material required for panel board: $250 x4=$1,000.00 replacement and wired <br /> extension at four (4) anode test station locations. <br /> 3. Complete and supply final report: $2,500.00 <br /> Total Cost: $29,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.