My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-11-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-11-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 4:40:35 PM
Creation date
11/10/2011 3:03:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
11/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3.A. - Page 6 <br />Exhibit A <br />Parks Impact Fee Project List <br />1. Acquire land for active park space as described in the 2008 Parks Needs <br />Assessment (defined by locations within the City) <br />2. Increase use capacity of athletic fields through the conversion of synthetic turf and <br />adding field lights where appropriate (i.e. Taft School turf conversion, Garfield <br />School turf conversion, and Guida -49er Field Lights) <br />3. Develop trails and other recreational uses in the Hetch - Hetchy right -of -way, <br />Redwood Creek, open waterways (as appropriate) and the connection to the Bay <br />Trail System (along Redwood Creek and connecting the Bay Trail from San Carlos <br />to Menlo Park) <br />4. Add new play equipment and amenities in parks for the purpose of increasing "play <br />value" and use capacity (defined in the 2008 Park Needs Assessment) <br />
The URL can be used to link to this page
Your browser does not support the video tag.