Laserfiche WebLink
Deliverable: <br /> a. Field notes. <br /> b. Meeting minutes. <br /> c. The Consultant shall prepare and submit six (6) full-size copies the draft Joint Trench Intent <br /> Drawing (95%) within six (6) weeks after NTP. <br /> d. The Consultant shall prepare and submit to the City ten (30) full-size copies of the final Joint <br /> Trench Intent Drawing suitable to the various utility companies within 30 days after receiving City <br /> staff's comments on the 95% drak intent drawing. <br /> e. Deliver final Joint Trench Intent Drawing to the utility companies. <br /> f. Comment-Response Matrix (Final Intent Drawing Comments from City Staf� <br /> Mark up (5%) of subcontractor's services represents Consultant's cost to manage subcontractors. <br /> Al'TY/AGR/2011.127/DSA BELLECCI 110000.DOC <br /> REV: 11/16/11 12 <br />