My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Kennedy Jenks Counsutants
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Kennedy Jenks Counsutants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 4:20:32 PM
Creation date
12/28/2011 8:22:43 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Counsutants
PROJECT NAME
Golf Course Irrigation Recycled Water Storage Facility Evaluation
RMP File Number
304.5
Date
12/27/2011
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d 3 MG storage <br /> Booster pump required in City's distribution sy'stem <br /> Delta-10 requirement remains (DPS discharge pressure -152.12') <br /> --> Model will be used to estimate Woodside Rd pipeline size and the storage facility fll rate that <br /> can be achieved. <br /> --> Model will be used to evaluate pressure benefit to City during nighttime demands with the <br /> DPS is turned off <br /> --> Nighttime demand scenarios will be modeled with two different irrigation peaking factors: 10 <br /> and 8 <br /> Site 2(Lower Tennis Courts: surf water elev 140') <br /> a 1 MG storage <br /> Deliver 720,000 gal; over 12-hr period (1,000 gpm) <br /> No booster pump in City's distribution system <br /> Delta-10 requirement remains (DPS discharge pressure -152.12') <br /> -->what size i eline? <br /> b 3 MG storage <br /> No booster pump in City's distribution system <br /> Delta-10 requirement remains (DPS discharge pressure -152.12') <br /> --> Model will be used to estimate Woodside Rd pipeline size and the storage facility fill rate that <br /> can be achieved <br /> --> Model will be used to evaluate pressure benefit to City during nighttime demands with the <br /> DPS is turned off <br /> --> Nighttime demand scenarios will be modeled with iwo different irrigation peaking factors: 10 <br /> and 8 <br /> c 3 MG storage <br /> Pump station to pressurize City system from tank and deliver irrigation water to Menlo CC (in lieu <br /> of a separate irrigation pump for Menlo CC). Aim for pump discharge pressure -70 psi. <br /> Delta-10 requirement remains (DPS discharge pressure -152.12') <br /> --> Model will be used to estimate Woodside Rd pipeline size and the storage facility fill rate that <br /> can be achieved <br /> --> Nighttime demand scenarios will be modeled with lwo different irrigation peaking factors: 10 <br /> and 8 <br /> Due to the increase in scope and number of modeling scenarios, we propose the following <br /> modified fee budget. A detailed fee estimate is provided as Enclosure (3). This revised scope <br /> will resuit in a total fee increase of $9,640. <br /> Fee Estimate <br /> Original Proposal Revised Proposal <br /> Estimated Total Budget Estimated Total Budget <br /> Task Description Hours Hours <br /> 1- Proj. Management, Meetings & QC 22 $4,030 22 $4,030 <br /> 2- Storage Facility Siting Evaluation 146 $27,810 195 $37,450 <br /> Total 168 $31,840 217 $41,480 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.