My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-01-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2012 1:23:44 PM
Creation date
1/5/2012 4:46:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> January 9, 2012 <br /> SUBJECT <br /> Award of Contract — Stulsaft Park Road Repairs Project <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the Stulsaft Park Road Repairs Project to McNabb Construction Inc. of Lafayette for <br /> their responsive and responsible low base bid of $107,828.00 and authorize the City <br /> Manager to increase the contract amount, if necessary, up to 10% of the amount <br /> awarded. <br /> BACKGROUND <br /> Stulsaft Park is a 42-acre park with unpaved maintenance/fire roads. Heavy rains have <br /> eroded road sections over the years, which may prevent access by maintenance and <br /> safety vehicles. <br /> ANALYSIS <br /> The project scope includes removing unsuitable trees and vegetation, re-grading <br /> drainage ditches, installing new drainage inlets, constructing new retaining walls in two <br /> locations, and placing new rock rip rap to minimize future erosion. <br /> The project was publicly bid through a notice in the Dailv Journal and for twenty-one days <br /> on the City's website. Nine (9) bids were received on November 23, 2011. They are <br /> summarized below. <br /> Bidder Total Bid <br /> McNabb Construction Inc. - Lafayette $107,828.00 <br /> Granite Rock DBA Pavex Construction Div.- San Jose 131,955.00 <br /> Guerra Construction Group — Santa Clara 132,205.00 <br /> Valentine Corporation — San Rafael 133,269.00 <br /> SCQ Construction - Cupertino 136,608.00 <br /> Water Rock Restoration — Santa Clara 144,540.00 <br /> Redwood Engineering Construction — Redwood City 158,640.00 <br /> O'Grady Paving, Inc. — Mountain View 197,700.00 <br /> C.F. Archibald Paving, Inc. — Redwood City 198,372.00 <br /> Engineer's Estimate $121,000.00 <br /> The low base bid of $107,828 submitted by McNabb Construction Inc., is 10.9% lower <br /> than the engineer's estimate of $121,000. In reviewing the bids, staff recognized that <br />
The URL can be used to link to this page
Your browser does not support the video tag.