My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Resolution PC 96-1 Flatirons Funding
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
1996
>
Resolution PC 96-1 Flatirons Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2012 6:18:38 PM
Creation date
1/19/2012 6:06:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
6/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(c) - The measures described above will substantially reduce the s' ' fic ce of <br />the Project's impacts on water quality. Development in the Bay area, 'includin <br />the Project, will, however, have effects on water quality that cannot be entirely <br />eliminated. Therefore, the City finds that this cumulative impact cannot be <br />mitigated to below a level of significance.. <br />(d) The .Statement of Overriding Considerations .set forth in Section 4 of this <br />document contains additional information explanun the reasons for the Ci 's <br />g ty <br />decision to approve the Project in spite of its environmental effects, and .is hereby <br />incorporated by.reference.., <br />2.4 NOISE <br />2..4.1 Potential Effect: The Pr oj ect will result in increased noise levels during <br />g <br />c0nstruction. <br />Findings: The City hereby makes Findings (1).and (3.). <br />Facts in Support of Find* <br />(a) The Planned Development Permit requires the applicant to comply with <br />Redwood City's Noise Ordinance for construction (No. 201.3). Compliance with <br />this condition will reduce noise levels during construction, but will not eliminate <br />noise completely. <br />(b) The Statement of Overriding Considerations set forth .in Section 4 of this <br />document contains additional information explaining the reasons for th City's <br />decision to approve the Project in spite of its <br />environmental effects, and is hereby <br />incorporated by reference. <br />2.5 TRAFFI <br />s <br />2.5.1 Potenfll Effect The Project will contribute to cumulative traffic impacts in the <br />Redwood Shores area. <br />Findin s : The City hereby males findings ( ( and (3). <br />Facts in Support of Findings: <br />(a) In addition to the Redwood Pe mnsula EIR, traffic �npacts from the Project <br />are evaluated in two reports: the Transportation Pl g Study .for the Redwood <br />Shores/101 Corridor, prepared by Crain & Associates for the City .in 1.9 "Crain <br />Study "), and the Traffic Impacts Study for the Electronic Arts Master Plan, <br />MNGP I .DOC <br />513019610:5 I AM i <br />
The URL can be used to link to this page
Your browser does not support the video tag.