Laserfiche WebLink
MITIGATION MO1vITORING PROGRAM <br />FOR THE ELECTRONIC ARTS HEADQUARTERS MASTER PLAN <br />1.0 INTRODUCTION <br />When an Environmental Impact. Report ( identifies measures to <br />avoid or mitigate potentially significant effects on the environment, a mitigation <br />monitoring or reporting program must be prepared. <br />The EIR. for the Electronic Arts Headquarters Master Plan C'Proitef <br />consists of the EIR for the General Plan for the Redwood Peninsula ( ".Redwood <br />Peninsula EIR ") and the Addendum prepared for the Project. <br />The following section identifies (1) mitigation pleasures for the Project; (2) <br />whether each mitigation measure will be enforced through the terms of the <br />Development Agreement ( "DX') or the Planned Development Permit ("PDP"); <br />(3) when the measures will be enforced (e.g., prior to the issuance of building <br />permits); and (4) the department responsible for enforcing the eondition (e.g., <br />Planning Department, Building Department.) <br />2.0 MITIGATION MONITORING PROGRAM <br />2*1 Oeotechnical.Problems: Increased ]Exposure to Seismic lisle <br />2. 13 Mitigation .Measure Comply with all recommendations of the <br />Project geotechnical report. <br />2.1.2 Enforcement PDP condition. <br />2.1.3 Tannin <br />2.1.4 R.es onsible Department <br />. . ..... ..................... <br />2,2 Geotechnical Problems: Settlement <br />2.2.1 Mitigation Measure Comply with all recommendations of the <br />Project geotechnical report. <br />2.2.2 Enforcement PDP condition. <br />292.3 T in3in <br />2.2.4 Responsible Department: <br />x <br />