My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Resolution PC 96-1 Flatirons Funding
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
1996
>
Resolution PC 96-1 Flatirons Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2012 6:18:38 PM
Creation date
1/19/2012 6:06:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
6/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MITIGATION MO1vITORING PROGRAM <br />FOR THE ELECTRONIC ARTS HEADQUARTERS MASTER PLAN <br />1.0 INTRODUCTION <br />When an Environmental Impact. Report ( identifies measures to <br />avoid or mitigate potentially significant effects on the environment, a mitigation <br />monitoring or reporting program must be prepared. <br />The EIR. for the Electronic Arts Headquarters Master Plan C'Proitef <br />consists of the EIR for the General Plan for the Redwood Peninsula ( ".Redwood <br />Peninsula EIR ") and the Addendum prepared for the Project. <br />The following section identifies (1) mitigation pleasures for the Project; (2) <br />whether each mitigation measure will be enforced through the terms of the <br />Development Agreement ( "DX') or the Planned Development Permit ("PDP"); <br />(3) when the measures will be enforced (e.g., prior to the issuance of building <br />permits); and (4) the department responsible for enforcing the eondition (e.g., <br />Planning Department, Building Department.) <br />2.0 MITIGATION MONITORING PROGRAM <br />2*1 Oeotechnical.Problems: Increased ]Exposure to Seismic lisle <br />2. 13 Mitigation .Measure Comply with all recommendations of the <br />Project geotechnical report. <br />2.1.2 Enforcement PDP condition. <br />2.1.3 Tannin <br />2.1.4 R.es onsible Department <br />. . ..... ..................... <br />2,2 Geotechnical Problems: Settlement <br />2.2.1 Mitigation Measure Comply with all recommendations of the <br />Project geotechnical report. <br />2.2.2 Enforcement PDP condition. <br />292.3 T in3in <br />2.2.4 Responsible Department: <br />x <br />
The URL can be used to link to this page
Your browser does not support the video tag.