Laserfiche WebLink
2.3 Air Pollution: hurt -Term Construction Ian acts° Visual Impacts <br />iDurin construction <br />2.3.1 Mitigation Measure Co final grading work M compliance <br />with the regulations contained m the . Redwood City Grading Ordinance, <br />2.3.2 Enforcement PDP condition. <br />23.3 Tirrlin„: <br />23.4 Responsible Department: <br />2.4 Air Pollution: Short - 'Term construction Impacts; Visual Irn acts <br />During; C onstruction - <br />24.1 Mitigation Measure Implement dust containment measures during <br />project excavation, grad ng end construction activities. <br />9 <br />2.4.E enforcement PDP condition. <br />2.4.3 Timin,�: <br />.2..4.4 .Responsible Department; <br />2.5 Water Pollution and ILdrolo <br />2.53 Mitigation, Measure Meet drainage and sto rmwater runo <br />regulations of the Redwood City Engineering Division; meet NPDES <br />Guidelines and regulations relevant to storm 'w aste management. <br />2.5.2 Enforcement PDP condition. <br />2. 53 Tim' <br />2.5.4 Responsible Department . <br />206 Noise: Increased Noise During Construction <br />........ .......... <br />2.63 Mitigation Measure: Comply with the City's noise ordinance for <br />co nstruction (No. 20.13).. <br />242 Enforcement PDP condition. <br />