Laserfiche WebLink
2.4.3 T urin <br />2.6.4 Responsible Department: <br />2.7 Traffic; Air impacts from Traffic - <br />.2.7.1 Mitigation .Mea sure : Partici in an assessme district for the <br />construction of off - -site traffic mitigatio'n improvements. <br />2.7.2 Enforcement DA.. <br />s <br />.2.7.3 Tirriin <br />2.7.4 Responsible Department: <br />2.8 Traffic Air!Q uaIj!j . Imj2acts from Traffic <br />2.8.1 Mitigation Measure Pay a. Facilities Fee, which will contribute to <br />off -site improvements made by the General Improvement District. <br />2..8..2 Enforcement: DA. <br />2.8..3 Timuz� At the time of the issuance of a b uilding permit (or on or <br />before January 1, 1997. and January L., 2002, if the square footage of floor <br />area.included in building permits issued by those dates. has not reached .a <br />Cumulative Total, as defined by the DA). <br />2.8.4 Responsible Department: <br />2:9 Traffic; .Air Q IW Impacts from Traffic <br />2.9.1 Mitigation Measure: Extend Shoreline Drive from its present <br />terminus to . Redwood Shores Partway. <br />2.9.2 Enforcement DA. <br />209.3 T imin g ". <br />v .2.9.4 Responsible Department <br />ri.rr�nrr..r �.urrrrrrrr <br />2.10 Traffic; Air Q uality Ian acts from Traffic <br />