My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-01-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-01-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 1:14:57 PM
Creation date
1/19/2012 6:36:41 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
1/23/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 17 <br /> 4. Prepare quantities and estimate <br /> 5. Perform independent internal quality control review check <br /> 6. Respond to one round of plan check comments per submittal, and <br /> internal Q/C comments as required. <br /> 4c. Construction Services <br /> • Review contractor materials submittals, mix designs, and shop drawings <br /> • Respond to contractor requests for information (RFI's) and provide <br /> clarifications to plans <br /> • Perform 1-2 site visits as requested, provide documentation. <br /> Task 5. Electrical Engineering: Plan, Coordination & Meetings <br /> 5a. Electrical/ Underground Constructions Documents (30%, 90% and <br /> 100%) <br /> CONSULTANT shall: <br /> • perform field investigation of site <br /> • participate in coordination meeting(s) with Pac Bell/AT&T/Comcast/PG&E <br /> for possible relocation <br /> • develop electrical construction drawings to replace/relocate any existing <br /> street light(s) and electrical equipment along Middlefield Road where the <br /> relocated storm drain will be installed <br /> • provide cost estimates for the electrical work, construction documents <br /> (30%, 90%, & 100%). <br /> 5b. Electrical Construction Support: <br /> During construction CONSULTANT will review electrical type submittals as <br /> needed, provide office consultation, review change order proposals, and <br /> make one final daytime inspection and punch list. <br /> ATTY/AGR/2011.140/DESIGN AGREEMENT BKF <br /> REV:12/22/11 <br /> Page 15 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.