My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Resolution PC 96-2 Flatirons Funds (2)
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
1996
>
Resolution PC 96-2 Flatirons Funds (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2012 9:25:35 AM
Creation date
1/23/2012 9:23:36 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
6/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br />CONDTI'IONS OF APPROVAL <br />1 o That the Development Agreement be reviewed and .approved by the City Council as <br />submitte . <br />2. That the applicant shall obtain development plan approval for each phase.. - Each <br />development plan shall be subsequently reviewed and approved by the Architectural <br />Advisory Committee .and Planning Commission as provided in the Development Agreement. <br />3. That the applicant .shall comply with all provisions of Part 77 of the Federal Aviation <br />Regulations applicable to the project. <br />4. That following development plan approval, the applicant shall also obtain all necessary <br />permits prior to construction including Architectural and .Building Permits. <br />5. That the applicant shall comply with all recommendations of the geotechnical report on file <br />with the Planning Division and any other future required soillgeotechnical studies. <br />6. That the applicant shall implement dust containment measures during the project excavation, <br />grading and construction activities. <br />7. That except as otherwise provided in the Development. Agreement, the applicant shall be <br />required to .meet drainage and storm water runoff regulations of the Redwood City <br />Engineering Division as provided in the Development Agreement. In addition, this <br />development shall be subject to NPDES Guidelines and regulations relevant to storm water <br />management. <br />8. That the applicant shall comply with. Redwood City's Noise ordinance for construction (To. <br />2013). <br />9. That, except as otherwise provided in the Development Agreement, the applicant shall <br />comply with all the Engineering conditions contained in the revised memorandum dated June <br />13, 1996, from the Engineering Division to the Planning .Director. <br />10. That, except as otherwise provided in the Development Agreement, the applicant shall <br />conform to all the recommendations of the Fehr & Peers Traffic Study dated November 1. 5, <br />1995, and any other traffic study which further analyzes necessary Redwood Shores <br />Parkway turning movements, subject to the terms and conditions of the Development <br />Agreement. <br />EDIT A <br />I BMWEACO DS.DDC <br />
The URL can be used to link to this page
Your browser does not support the video tag.