My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:10:49 PM
Creation date
2/2/2012 3:42:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 2 <br /> • Upgrade the roof of the Carson Reservoir to withstand higher seismic loads. <br /> • Upgrade equipment restraints at pump stations and modify two pump station <br /> roofs. <br /> • Evaluate foundation piles at Peninsula Water Tanks Nos. 1 and 2 in Redwood <br /> Shores. <br /> Because earthquake design is an engineering specialization, staff recommends that G <br /> & E Engineering Systems, Inc., be retained to provide the design and bidding/ <br /> construction support for these seismic improvement projects. G& E Engineering <br /> Systems, Inc., has extensive knowledge of the city's potable water system, as they <br /> prepared the original seismic assessments and helped develop the city's Water System <br /> Master Plan. G& E has also performed similar specialty engineering work for other <br /> water agencies in the Bay Area, southern California, and other countries. <br /> In an effort to deliver the most cost effective projects, G& E Engineering Systems, Inc., <br /> will complete the design of the planned seismic improvement projects in 2012. <br /> Construction of individual projects depends on funding over the next five years. The <br /> first construction package is currently planned for summer of 2012. <br /> ALTERNATIVES <br /> Council may choose not to approve the proposed agreement with G&E Engineering <br /> Systems, Inc., and direct staff to find alternate means of completing the work, or modify <br /> the scope of work, or select other consultants. <br /> FISCAL IMPACT <br /> Funds for this project were partially and previously appropriated as Water Fund Capital <br /> Projects — Water System Seismic Update. This budget line has an available balance of <br /> $169,211.28. Additional funding in the amount of $170,000.00 will be provided from an <br /> associated account, Water Fund Capital Projects - Distribution System Replacement <br /> Program, which has an available balance of $451,087.70. <br /> ENVIRONMENTAL REVIEW <br /> The engineering design and study proposed in this report do not constitute a project as <br /> defined by the California Environmental Quality Act. Environmental review will be <br /> conducted for each construction package. <br /> PHON� Du, PE <br /> SENIOR CIVIL ENGINEER <br />
The URL can be used to link to this page
Your browser does not support the video tag.