My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:10:49 PM
Creation date
2/2/2012 3:42:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 19 <br /> modifieations will be incorporated inta the 1 �D% Finalized Plans, Calculations and <br /> Specifi�ations. All comments shall be either incorporated, or respanded �o if not <br /> inearporated. Gansu6tant st�a�l finalize all construction documents for �idding �i.e., plans <br /> and specifications) and shall fi�alize the Er�gEneer's Cast Estimate. <br /> Task �b. Pipes at Share�ird Island and Bridge Park�nray Bridges <br /> There is a 8-inch diameter water pipe that is supported an the existi�g (c. 1981-vir�tage) <br /> Shore�iird Island bridge in �Z�dwoad Shores. B�sed on pre�iminary review, the bridge is <br /> 3-span, a pile supp�rt structure, with deCks having rol�er-pinned type s�u�ports; the pipe <br /> is �teel, supported by roller-type supports and is supparted far deadweight loads. The <br /> pipe goes throug� the pier caps though �r�pty annulus, requiring mit�r be�d� Fn th� pipe <br /> to accommodate actual annulus locations. Pipe girth }oint conn�ctivns are made �s�n� <br /> Dresser-typ� slip cc�uplin� units. <br /> There is concern the pip� may fail unde� ��ismic loads. This might happen due ta <br /> ir�ertial loading an �he pi�e; differ�ntial mc�vement between the bridge decks 1 pi�r caps <br /> and the pipe; thrus� farces; abutment movements. <br /> There is a 16-ir�ch diameter water pipe that is supported on the existing Bridge Par�Cway <br /> �ridge in Redwood Shores_ Based on recent inspections, one o# the pipe joints has <br /> failed. There is concern tl�at seismic loads wauld aggravate the situ�tion. <br /> Cons�tltant will evaluate the pipes ta allow them to perform after a large earthq�ake on <br /> either the nearby San Andreas or Hayward faults. Using ALA (2005) termino�vgy, <br /> Consultant will con�ider the pipes as Category III (important} pipe, designed for seismic <br /> effects considered a 975-year r�turn period motion. <br /> Approach � Consultant will in�pect the pipes and bridges at the two �ites. Consultant will <br /> then esta�lish site-specific seismi� ground motions, considering grQUnd shaking {975- <br /> years) and poter�tial �or permanent grourrd defflrmations (settlements and late� <br /> spreads}. Consultant will use existing subsurFace information for Redwood Shores <br /> (original Fte�wood ShAr�s development data, plus loeal soils report by Cooper Clarlc, if <br /> available), supplemented with any extra subsurfaee information made available to us. <br /> Cansultant will eval�ate the c�mbined existin� bridge — pipe system for thermal and <br /> seismic effects. Gansultant will examine the stresses in the pipe; deformation �t pipe <br /> joir�ts along the bridge; and impacts to the pipe at either bridge abutment. Gonsultant <br /> will try to establish the likely cause(s) of the damaged wat�r pipe joint on the Bridge <br /> Parkway bridge. Gflnsultant will also assess the likely performance of the bridge, as if <br /> pertains to t�e perFormance o# the pip�s. Consultant will establish the adec�uacy of the <br /> as-is system (likely nat); and also pro�ide upgrade optiflns, including: <br /> • Madifiy pipe suppor#s an the bridge <br /> � Modify pipe (change of jvints; etc,) an the bridge and appraaches. For the 16'° <br /> pipe on the Br�dge Parkway bridge, Cons�ultant will devslop a repair strategy for <br /> the pipe that has already had a damaged joint. <br /> ATTYl�4GR12012.0011G&E �V�fGIC�EERING Page 15 of 3Q <br /> R�v�n�r�nri� <br />
The URL can be used to link to this page
Your browser does not support the video tag.