Laserfiche WebLink
6.1.A. - Page 18 <br /> � Drawings (11 x17) showing e�etails of connections, foundatians and an�hor <br /> typicals (50% complete). Preliminary calculatiar�s (partial as avail�ble) <br /> • Overall scope of construction work — description and updated cost <br /> estimate. <br /> � ProposecE specifications and standards. Redwvod �ity shall �upply "boiler <br /> plat+e" sections of the standard specifications as commonly used far <br /> similar work by Redwood City, frvm which Gonsultant sh�ll modify as <br /> needed for this praject. Consultant wilf deuelop all te�hnical <br /> specifications. <br /> 9D°/a E�esign S�abmittal and ReWiew <br /> Consultant shall develop complete (90%) design plans and specifications for the prcrject <br /> #or Redwood City final revi�w. Detailed d�sign $hall conform to all applicabl� water <br /> indu�try codes and Redwood Gity design standards; and shall be stand-alone bid <br /> documents. As delivered, th� 90%a docurr�ents shall be re�dy for advertisement and <br /> competitian, to the extent practical, subject ta any changes the Redwaod City may <br /> id�ntify or limited open issues. <br /> Consultant shall prepare an up�ated draft Engineer's Cost Estimate for cons#ruction � <br /> activities. <br /> Consultant shall perform an infernal QA audit of th� designs to assure that the designs <br /> meet the int�nded project goals in a cost effective manner. <br /> Consultant shall assist Redwoad City in r�spor�ding to the 90% ❑e�ign Revieuv <br /> S�bmittal c�mments from Redwnod City Operations, Maintenance, �nd �ngineering <br /> staff. <br /> Deliverables. <br /> • Thre� sets (11" x 17") of drawings and specificatians sha[I be provided ta <br /> Redwood City for review at the �0% level of completion_ Consultant shall <br /> have performed its enternai quality control prior to fhis submittal. <br /> • Electronic fifes on CD d�skette (or delivered by email� to F�edwooci City. <br /> • Preliminary Engineer's Estimate. Estim�te shall include a breakdc�wn of <br /> labor, material quantities, and unit prices. The e�timate shalM list al[ <br /> �assumptions including overhead and prafit, subcontract mark-ups, tax <br /> and contingency. Support documents shall be submifted wi�h the cost <br /> estimate. <br /> • One set af 90% Cal�ulation�, stamped "Nat fior Construction". <br /> 1 fl0% Design <br /> Redwoad City will perform a detaiied design review of the �Q°10 s�bmitt�l. ��nsultant will <br /> meet with Redwaod City staff ta review camments on the �0% review. <br /> ConsuAtant shall make all necessary revisi�ns and moc�i#iGatians to #h� 90°/a Design as <br /> agreed upon be�ween RedwoQd City and Consultant. These revis�ons and <br /> ATTYIAGR12012.D011G&E ENGWEERING Page 14 of 30 <br /> Q�t��n�l�nr�� <br />