My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:10:49 PM
Creation date
2/2/2012 3:42:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 21 <br /> Task 2. �Carsan Resenrarr <br /> Consultant will c�euelop the can#ract documents to seismically-upgrade Carson <br /> Reservoir. Twa upgrades will be developed: <br /> • Roof upgrade for seismic loads. This may inelude retention af the exis#ing rpof <br /> diaphragm and roa#ing system; ar replacement of part or all of the existing <br /> roa�ing system with a steel carrugated panel system. <br /> • Mfldify the alignment of an exis#ing portion of the outlet pipe where it crosses <br /> overlunder the near�y BDPL 3�nd 4 pipelines. This reflects that a recent <br /> modificatian ta fhis pipe put it over BDPL 3, resul�ing in an inverted siphan that <br /> limits access to the water in the fower part af the Carson reservoir. The new pipe <br /> �lignment will be at a gr�de lin� ta allow for �ccess to all water in the � <br /> via gravity flow. <br /> During the course vf �he design effort, Consultant �xpect to be in�ormed as ta whether <br /> }�ortions (ar all} of this wark is co-funded by grants from FEMA. In order to ensure <br /> correct bovk-keeping for FEMA purpos�s, all cnsts associated with Task 3 will be <br /> tracked �eparate�y. <br /> Required Submitals: <br /> �5%a and 50°/a Design Submittal and Review <br /> The final engin�ering and desi�n wil[ be performed to meet the intent af the ACI 318 <br /> and ACI 359 codes, complemented by IBC 2009, ALA {2QU5) and other industry <br /> documents as �ppr�priate. Seisrnic res�onse modification factors sharl be no higher <br /> #han allowed by code for new construction, or lower if exist�ng detailing does not prouide <br /> suitable duc#ility to meet th� intended perFormance. <br /> Consultant shall submit #inal structural calculations, stamped and wet signed by a <br /> California Prafessional Engineer (Mr. Eidinger or Qr. Dugg�n for civil and structural <br /> work). <br /> Final drawings shall be in D size (24x3�i inch} format. <br /> The patenti�l list �af drawing5 is listed in Table 3. <br /> ATTYIAGW2012.001lG&E EI�GINEERING Page 17 of 30 <br /> �Gi�•n���nt�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.