Laserfiche WebLink
6.1.A. - Page 22 <br /> Item h�umb�r of �Potential Drawing List for Cantract Documents <br /> Drawir�gs <br /> Gener�l 1 Structural, st��1, conc�ete pip� and 4ther key <br /> Nflt+�s s ecifications. <br /> Civil 1' Res�rvoir site layout, showin known i� locatians <br /> Structural 5 Details of structural im rovements of the roof s stem <br /> Ripeline 1 Relocated pip�line plan �nd profile near BDPL 3 and <br /> 4 <br /> Total 8 <br /> Table 3. Carsan Reservoir �rawing List (Potential} <br /> To the maxim�m extent, Consultanf will re-use �vailable Redwood Gity drawings (TIF <br /> a�d PDF �s-builts) as backgr�und infarm�tion, with new d�tails to be shawn ar� suitable <br /> new layers, and �xisting information shawn "grayed"'. Site plans will b� based on <br /> available informatio� shown on available Redwoc�d City drawings. New patholing ar <br /> survey is not includ�d as it is not warranted for the sei�mic upgrade work; but if de�med <br /> necessary far other purposes as may b� required by Redwood City, then the additional <br /> survey work shall be negotiated or shall be provided by Redwood City. <br /> Cansuitant �hall submit a 25%o submittal which will include c+nnceptual design sketches <br /> far the seismic up�rades. RWC will pravide comments wit'�in 1 week of submitzal. <br /> Gonsultant shall develop a 5Q% review set of draw�ngs for the sei�mic upgrades and an <br /> outline Qf the construction specifications #or submittal #o Redwoad City. The purpose of <br /> th�s �ubmittal is ta abtain Redwoad City comments on the proposed designs, to assure � <br /> compliance with project goals, and t+� d�termine confnrrnance with Redwaod City <br /> standards. <br /> Redwaod City will provide Cansultar�t with hard copy and electronie versions of <br /> stand�rd specificatians for similar designs developed by Redwood City. It is assumed <br /> that Redwood CEty has a recent underw�ter dive inspection for Ga�son reseruoir, and <br /> will make the fin�ings a�raiia�ale to Consultant; if not, or far other reasons anather <br /> underwater inspection is warranted, Consultant can organize an additiortal ins,�ection <br /> (DiveCorr, est%mated $4,Ofl�) as an optional task. <br /> Deliwerables: <br /> • 25°fo conceptual de�ign sketches. <br /> • Drawing list that identifies all proposed Drawings and Specificatians to be <br /> deluvered. <br /> ; Location p�an drawings for each site that show which major com�onents <br /> are to be upgradeei. <br /> • Dr�wings (� 1 x17) sf�owing details of connections, foundations and anchar <br /> typicals {5p°,/o compl�te). Preliminary ca�culatians (partial �s available) <br /> • Overall scope of cc�nstructian work — d�sc�iptiarr and updated cost <br /> estimate. <br /> ATTYIAGR12b12.0011G&E ENGII�lEERING Page 18 0� 30 <br /> RF�i•n� i�n�� � <br />