My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:10:49 PM
Creation date
2/2/2012 3:42:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 23 <br /> • Proposec� specifications and standards. Redwood City shall supply °boiler <br /> pla#e" sections of the standard specificatinns as commonly used far <br /> similar work by Redwood City, #rom whi�h Consultant shall modify as <br /> needed far this project. Gonsultant will develop all techn�cal <br /> specif cations. <br /> 9U% Design Suhmittal and R��iew <br /> Consultant shall d�velop corr�plete (9D°!o) design plans and specificatinns for the project <br /> for Redwaod City finaf review. Detailed design shall conform ta all �r�plicable wa#er <br /> industry codes and Redwooef City d�esign standards; and shall be stand-alone bid <br /> dacuments. As delivered, the 90% docurnents shall b� ready for advertisement and <br /> competition, tca the axtent practical, subject ta a�y changes the Redwood City may <br /> identify or limited open issues. <br /> Cansultant �hall prepare an updated draft E�gineer's Cos# Estimate for constructior� <br /> activities. Cvnsultant shall perForm an internal QA audit of the desigr�s to assure that <br /> the designs me�t the intended project goals in a cost effective manner. <br /> Consultant shall assist R+edwood City in respc�nding to the 90% Design Review <br /> Submittal Gomm�nts from Redwood City Operatians, il/�aintenance, and Engineering <br /> staff. <br /> The following d�sign assumptians shall apply: <br /> 1. Sp�cifications shall be created usjng Redwood City general requirements <br /> ar�d standard techflical specifications. Redwood City shall provide <br /> el�ctronic files for spec6fications. Consu'tant will provide al� technical <br /> specifica�ions. <br /> Deli�erables. <br /> 1. Three sets (11" �c 17") nf drawings and specifications shall be provided ta <br /> R�dwoad City for review at the 90% level af complet�an. Consultant shall <br /> have performed its intern�l quality control prior to this su6mittal. <br /> 2_ E�ectronic files on CD disk�tte (or delivered by emai�) to Rec#wood City. <br /> 3. Preliminary Engineer's Estimate. Estimate sha4! ir�clude a breal�down of <br /> labor, material quantities, and unit prices. The estimate shall list all <br /> asstamptians includi�g overhead and profit, subcantract mark-ups, tax anc4 <br /> contingeney. Suppart doe�ments shall be submitted w�th the cost <br /> �stimate. <br /> �4_ One set of 90% CalculatEans, stampe� "Not for Constructivn". <br /> 10�1% D�sign <br /> Due ta the need to keep c�sts separate for purpos�es of FEMA co-funding (ifi auailable), <br /> Consulta�t will develop the specifiications and drawings for Car�vn reservoir assuming it <br /> is bid separately fram other work eler�nents {`Tasks 1 and 2�_ Depending on what <br /> ATTYIAGRI2�12.0011G&E ENG�NEERlfVG '�age'f9 of 30 <br /> RF��•n� r�nr�r� <br />
The URL can be used to link to this page
Your browser does not support the video tag.