My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:10:49 PM
Creation date
2/2/2012 3:42:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 25 <br /> Consult�nt shall submit final structural calculat�or�s, stamp�;d and wet signed by � <br /> C�lifornia Rrofessiona� Engineer (1VIr. Eidinger or Dr. Duggan for civil and structural <br /> work). <br /> Consul#ant will develop structural details far the variaus equipment anehorage and <br /> restraint upgrades. Consultar�f will provide a cauer sheet listing these upgrades, which <br /> w�ll include ge�eral notes as well as a table indicating the qu�ntities and locations. The <br /> drawings will show ph�otos of the item(s� tn be modified, as well as detail� af the <br /> modifications. <br /> For the structural madificatinns for the Carson and Cambridge pump station roof <br /> syst�ms, Con�ultant will sh�w outlines of the exis�ing b�ildvng, and details af the <br /> mc�dificatior�s (gen�raUy, new plywood anc� raod as needed, blockin� and nailing <br /> schedules). <br /> To limit the drafting effort, site drawings for equipment upgrades will not be created. A <br /> Table will be included for equipment upgrad�s, to direct the contractor for the locat�ons <br /> of the iterns t� be mod�fi�d; photos wiil show the existir�g item to be madified. The <br /> design details will shaw the primary upgrade concept, tail�red to allow adjustment in the <br /> field to reflect field dimensians. Special inspection will be required during cc�nstruction to <br /> verify that the actual equipment inst��lations meet the intent of t�e desigr�. <br /> Final draw�ngs shall be in 24x36 inch format. <br /> The potential list af dr�win�s is listed in Table 4. <br /> ltem Number of Patential Drawing List for Cantract Documents <br /> Drawin s <br /> General 1 <br /> Notes <br /> Anchorage I 3 Batteries; MCCs; Generators; Pipe <br /> Restraint <br /> Structural 2 Qetails of structural im roveme�ts af the roof s stem <br /> Curb� ! 2 1 for Sequoia site, 1 far Cambridge site <br /> Berms <br /> Total 8 <br /> Table 4. Equipment and �ther Drawir�� List (Potential} <br /> To the rnaximum extent, Consultant will r�-use available Redwood City drawings (TIF <br /> and PDF as-k�uilts} as background in#ormation, with new details ta be shown on suit�b�e <br /> new layer�, and �xisting information �hown "grayed". Site plans will be based on <br /> avail�ble infc�rmation showr� on availai�l� Redwooc� City drawings. <br /> ATTYIAGR12012.D011G&� ENGINEERING Page 29 of 3b <br /> Q�r�n� r� n�9 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.