Laserfiche WebLink
6.1.A. - Page 26 <br /> Consultant shall submit a 25% submittal which will include cnnceptual design s�etches <br /> for the seismic u�grades. RVIIC will prc�vide comments with�n 1 w�ek of submittal. <br /> Consult�nt shall deve6o� a�0% review se# of drawings far the seismic �pgrades and an <br /> outline �of the constr�ctian specifications fe�r subrr�ittal to Redwood Gity. The purpose of <br /> this submittal is tn obtain F�ec�wocad City camments on the proposed designs, to assure <br /> campliance uvith project goals, and to determine conformance wit� Redvuood Gity <br /> standards. <br /> Redwoad City will pr�v�de Consultant w�th hard copy and electranic versions of <br /> standard spec�ficatinn$ fc,r similar designs developed by Redv+road City. �onsultant will <br /> provide all technical s��cifications_ <br /> Delirrerables: <br /> • 25% canceptu�l desic�n sketches. <br /> • �rawing list that ident�fies all proposed Drawir�gs and Speci�ications to be <br /> d�livered. <br /> • Drawings (11 x17) showing details of restrain�, artchors, ar�d roof system <br /> improvements (�0°lo complete}. <br /> • Overall scope of construction work — description and updat�d cost <br /> estimate. <br /> � P�opased specifications and standards. Redwood C�ty shall supply "k�oiler <br /> plate" sectic�ns of the specifiGations as eommanly used for similar work by <br /> Redwood City, from which G�nsultant shafl modify as needed far this <br /> proj e�t. <br /> 90°/a pesign Submittal and Re�iew <br /> ConsuCtant shall develop complete (90%) design plans and specificatic�ns for the projeet <br /> for Re€�wood City fir�al review. Detailed design sh�Cl canform fio all applicable water <br /> industry cades and Redwood City design stanclards; and s�all �e stand-alone bid <br /> documents. As de�ivered, the 90% dacuments shall be ready fpr advertiserrient and <br /> competiticrn, to tf�e exten� practical, subject to any chanc�es the Redwaod City m�y <br /> identify ar I�mited apen issues. <br /> Consultant shall prepare an updated draft Eng�neer`s Cc�st Estimate for constructi�rt <br /> activities. <br /> Consultant shall perforrr� an internal QA audit of the designs to assure that the des�gn� <br /> meet the intended prajeet goals in a cost effective manner. <br /> Can�ult�nt shall assist Redwoad City in respanding ta the 90°lo Qes9gn Reviev,� <br /> �ubmittal Gomme�ts from Reciwood Gity ap�ratians, Maint�nan�e, and Engineering <br /> sta�f. <br /> TI�� fc�llawing design assumptions shall apply: <br /> AT"i'1(1�4�fi12012.�411G&E ��lGINEERING Page 22 af 36 <br /> I?�i/•fi1llfiPi7 <br />