My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:10:49 PM
Creation date
2/2/2012 3:42:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 27 <br /> • Speci�ications shall be created using Redwoad City general requirements <br /> and technical specifications. Redwood City shall provide �le�tranic files <br /> far spe�ifications. <br /> Deliv�rahles. <br /> � Three set� (11" x 17") of drawings and specifications shall b� provided to <br /> Redwood City for review �t the 9a% level of completion_ Consultan# shall <br /> have performed its internal quality control prior to this submittal. <br /> • Electronic files on CD diskette (or delivered by em�il} to Redwoad City. <br /> • Preliminary Engineer's Estimate. Estimate shaif incl�de a breakdc�wn ❑f <br /> iabar, material quantities, �n�d unit price�. The est�mate sh�ll IESt all <br /> assumptions including overhead and profit, subcontract mark-ups, tax <br /> and contir�gency. Suppar� dacu�nents �hall be submitted with fhe cc�st <br /> estimate. <br /> • One set of 90% Galculations, sfamped "fVot far Construction". <br /> 1 UQ% Design <br /> Due to thc� need ta keep cc�sts separate for purposes of FEMA, co-funding {if available), <br /> Consultant will deuelop th� specification5 and drawings for equi�ment madifications <br /> assuming it is bid sepa�rately frc�m other work efemenfs (Tasks 1 and 2}. Depending on <br /> wha# happens with the FEMA grant !request, this might be altered to best serve <br /> Redwood City and FEMA's needs. <br /> Redwood City will perfarm a deta�led design review of the 90°!o subnnittal. Consulant wifl <br /> meet with Redwood Gity staff to revi�w comments on the 90% review. <br /> Consulfant sh�ll make all ne�essary revisions and modification� to the 9a% Design as <br /> agreed upan between Redwood City and Consultant. Tnese r�visir�ns and <br /> madifieations will be in�orporated inta the 100% FinalEZed �lans, Calcu�atians and <br /> Specifications. AVI comments shall be either incorporated, or respar�ded to if n�t <br /> ineor}acarated. Cansuitant shall fin�lize all construction documents f�r bidding (i.e., plans <br /> and specifications) and shafl finalize th� Engineer's Cost Estimate. <br /> Task 4. Penrnsula 7anks <br /> It is recognized that the existing piie foundatians #or the Peninsula 1 and 2 tanfcs may <br /> have been somewhat damaged in th� 1989 Loma Prieta �arthquake, and possibly much <br /> mor� seriously damaged in future larger earthquakes. <br /> ln order ta e�tablish a sustable long term capital plan for these two tanks, the following <br /> inve�tigations wil! be performed. <br /> • Perform subsurface inspections at six locations along the perimeters ofi these twa <br /> tanks (three lacations per tanks}. To do this, Consultant will wark with Redwaod <br /> City ta �rganize a eontractor (or Redwc�od City fvrces} to �xcavate about 6-foot <br /> deep pits at suetable locations alang the edges of the tanks. T#�ese locations will <br /> ATTYIAGW2p12.QQ11G&E EAlGINEERING Page 23 of 30 <br /> Q��r�n� r�nr� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.