Laserfiche WebLink
6.1.A. - Page 32 <br /> Task JME DMD DLH Drafting FUGRO DDCs Labor 7otal <br /> �zza $Z9s $1z� $szs �zao <br /> Task 4 Peninsula Tanks <br /> Develop Site Test �lan g $1,792 $1,792 <br /> big up piles, 5ite Inspection Zz 12 $S,oss $5,U88 <br /> 551 Analysis 16 4� 8(� 16 $100 $28,864 $28,964 <br /> Engineering Assessment 12 1Z $5,064 $5,064 <br /> Draft Report g g $3,376 $3,376 <br /> Meeting g 4 $2,592 $Z,592 <br /> Final Report g 2 $2,19Z $2,192 <br /> Subtotal 7ask 4 72 64 80 fl 34 $1a0 $48,968 $49,068 <br /> Task 5. Bid Services g g 8 16 2 $200 $7,192 $7,392 <br /> Taslc 6. Services During <br /> Construction 4b 60 60 40 4 $400 $3J,250 $37,65� <br /> To#als 272 422 540 398 66 $4,900 $3�3,014 $3D7,914 <br /> � <br /> I <br /> I <br /> ATTYIAG�2I�Q12.0011G&E ENGlNEERfNG Page 28 of 3U <br /> RFI/•f1111{111 � <br />