Laserfiche WebLink
6.1.A. - Page 33 <br /> 4.0 Project arganization <br /> Mr. Jnhn Eic�inger wi61 be t�re Praj�ct Man�ger for this wark. He will alsa �e technically <br /> respansible for laying out �he project alternat��es and desic�n concepts, the structural <br /> perFormance criteria, the prbs and cons of each alternative. <br /> Mr. Eidinger has working knowledge of R�dwood City's water system. He has visited all <br /> sites and has knowledge ofi the structura{ issues relateci to each t�nk, structure and <br /> piece of e�uipmenf. <br /> 5.a Pro�ect scnedu�� <br /> The schedule to perform the work �s as follows: <br /> Notice tc� Proc�ed February 15, 20�1 �(t�rget �ate}_ <br /> Submit draft Reports ( Ta�ks 1 b, 4} NTP + 3 months <br /> Submit 50% Plans, Specs & Estimates NTP + 6 months <br /> Subrr�i� 90%a P1an�, Specs & Est�mates NTP �- 9 months <br /> Submit 10�°Jd P�a�ns, Specs & Es#imates NTP +� 1 mvnths <br /> A rr�ast�r prdj�ct schedule �howing all review cycles a�d subtask$ will be provided twa <br /> we�ks after Notic� to Pr�ceed. The target schedule is to h�v� constructi�n work for <br /> Task 1 be bid in 2012; Task 2 in 2013; and Task 3 ir� 201�. ' <br /> 6.0 Supple�mental Informatic�n <br /> The Ci�y has exis�ing steel tank coating specifications used far past tank painti�g. Th� <br /> Exterior prime coafis on both Ca�br�d�e tanks are lead bas�d. The c�ty rnay choose to <br /> recoat the ceilings (inside of roaf) for bot� Cambridge tanks in the summer of 2012; this <br /> wark may be added to the �'ask 1 bid package. <br /> ATTYIAGR12012.0011G&E ENGIN�ERI�fG Pag� 29 of 3ff <br /> Q�vn�l�nt�� <br />