My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 BKF Engineers Planners Surveyors
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 BKF Engineers Planners Surveyors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2012 4:11:44 PM
Creation date
2/7/2012 4:11:43 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers Planners Surveyors
PROJECT NAME
Redwood Creek Box Culvert Relocation Project
RMP File Number
304
Date
1/27/2012
MO Ref
12-017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e. Preparing Preliminary Engineer's Opinion of Probable Construction <br /> Cost and drawings submittal for 30% review. <br /> f. Preparing Construction Documents to include the following at a <br /> minimum: <br /> C1 Cover Sheet Project Locations and Index Plan <br /> C2 Preliminary Plan & Profiles <br /> C3 Preliminary Grading & Utility Relocation Plan <br /> C4 Typical Sections & Details <br /> Preliminary - Structural Drawings <br /> Preliminary - Electrical Relocations Plans <br /> g. Responding to one round of plan check comments per submittal, and <br /> internal Q/C comments as required. <br /> Deliverables will consist of 2(two) sets of full size 30% plans, an electronic copy <br /> in PDF format, and a Preliminary Engineer's Opinion of Probable Construction <br /> Cost for the project. <br /> Task 3c. Prepare 90% & 100% Construction Documents (Plans 8� Specs.) <br /> CONSULTANT will prepare 90% & 100°/a Construction Documents, including <br /> plans and specification related to grading, street improvement plans and utility <br /> plans, as required by the City of Redwood City as part of the concrete box culvert <br /> relocation requirements including grading and modifications to the street right-of- <br /> way improvements and modifications to utilities to facilitate the proposed new <br /> culvert alignment. CONSULTANT will show and document existing utilities to <br /> remain and those that will need to be relocated and their impact to the proposed <br /> new culvert alignment. In addition, CONSULTANT will provide civil engineering <br /> consultation with the City regarding review and revisions associated with the <br /> 90% and 100% Bid documents. <br /> These 90% plans will be ready for final reviews based on a design consensus <br /> with City staff during the review of the 30% submittal. Specific tasks to be <br /> performed during this phase will include at a minimum: <br /> . Incorporating comments from City. <br /> . Finalizing street improvement, grading design and detail preparation. <br /> . Finalizing storm drainage detail design. <br /> . Preparation of specification package. <br /> . Engineer's Opinion of Probable Construction Cost and drawing submittal <br /> . Project administration and quality control review. <br /> . Responding to one round of plan check comments per submittal, and <br /> internal Q/C comments as required. <br /> Deliverables will consist of 2(two) sets of full size 90% plan sets and <br /> specification package with supporting documents and an electronic copy in PDF <br /> format. <br /> ATTY/AGR/2071.140/DESIGN AGREEMENT BKF <br /> REV:12/22/11 <br /> Page 12 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.