My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:23:27 PM
Creation date
2/9/2012 4:35:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/13/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. B. - Page 157 <br /> • Parking <br /> ✓ The project proposes parking consistent with the City's zoning <br /> ordinance. <br /> ■Response to Issues Raised in Comment Letters: <br /> •Construction Impacts <br /> ✓ Construction traffic would be less than project traffic and the <br /> project would be required to comply with standard City <br /> regulations regarding construction truck traffic (Municipal Code <br /> Chapter 24) <br /> • Bicycle corridors <br /> ✓ The project will not preclude the future use of the Hetch-Hetchy <br /> ROW as a bicycle corridor. <br /> ■Response to Issues Raised in Comment Letters: <br /> • Air Quality <br /> • Identification of existing pollutant sources in the project area <br /> • Dust and pollutants during construction <br /> • Methodology of Toxic Air Contaminants (TAC) analysis <br /> ✓ BAAQMD is the regional agency with primary responsibility for <br /> regulating pollutant emissions and regulating and maintaining <br /> air quality. The air quality analysis for the proposed project <br /> followed all BAAQMD recommended methods. <br /> ■Issues Raised in Comment Letters: <br /> • Greenhouse Gas Emissions (GHG) <br /> • Inconsistent baseline <br /> ✓ It was found that the baseline conditions for the GHG Emissions <br /> analysis was inconsistent with the rest of the document. GHG <br /> emissions were recalculated using the correct baseline. The <br /> conclusion of the Draft EIR did not change as a result of the <br /> reanalysis. <br /> • Cultural Resources <br /> • Mitigation for subsurface work within the Caltrans ROW <br /> ✓ Caltrans requested additional mitigation for subsurface work <br /> within their ROW. This mitigation was added to the project as a <br /> text amendment to the Final EIR. <br /> •Geological <br /> • Mitigation of expansive soils within the Caltrans ROW <br /> ✓ Mitigation was proposed in Draft EIR for all geological conditions <br /> • Hazardous Materials <br /> • Discussion of asbestos and lead-based paint impacts <br /> ✓ Impacts from asbestos and lead-based paint were addressed in <br /> the Draft EI R <br /> • Visual Intrusion <br /> Page 7 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.