My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task Facility Name item <br /> 1a Glenlock Tank Flexible overflow pipe <br /> la GlenlockTank Flexible drain pipe <br /> la Easter Cross Tank Flexible overflow pipe <br /> la Easter Bowl Tank Anchor tank <br /> la Easter Bowl Tank Flexible overflow pipe <br /> la Cambridge 1 Tank Modify Pipe Supports <br /> la Cambridge 1 Tank Flexible overflow pipe <br /> la Cambridge 1 Tank Flexible drain pipe <br /> 1a Cambridge 2 Tank Anchor tank <br /> la Wilmington Tank Heavier anchorage <br /> 1a Wilmington Tank Flexible overflow pipe <br /> la Wilmington Tank Flexible drain pipe <br /> Sb Redwood Shores Seismic Reinforcement of 2 Pipes on Bridges <br /> Z Carson Res Upgrade Roof/Discharge Piping <br /> 3 Peninsula 1 PS Restrein Batteries <br /> 3 Peninsula 1 PS Anchor MCC <br /> 3 Peninsula 2 PS Restrain Batteries <br /> 3 Sequoia 1+2 Tank Install Berms <br /> 3 Carson PS Anchor MCC <br /> 3 Carson PS Restrain Batteries <br /> 3 Carson PS Improve roof diaphragm <br /> 3 Glenlock PS Restrain Batteries <br /> 3 6lenlock PS Anchor MCC <br /> 3 Glenlock PS Restrain Generator <br /> 3 Lakeview Res Restrain pipe <br /> 3 Lakeview PS Restrain Batteries <br /> 3 Lakeview PS Anchor MCC <br /> 3 Lakeview PS Restrain DG Batteries <br /> 3 Cambridge 2 Tank Install curb <br /> 3 Cambridge PS Restrain Batteries <br /> 3 Cambridge PS Anchor MCC <br /> 3 Cambridge PS Improve roof diaphregm <br /> 3 Edgewood PS Restrain Batteries, MCC, Generator <br /> 3 Eagle Hill PS Restrain Batteries <br /> 4 Peninsula 1 Tank Pile review / upgrade <br /> q Peninsula 2 Tank Pile review / upgrade <br /> Seismic Improvement Plan <br /> ATTY/AGR/2012.001/G&E ENGINEERING Page 11 of 30 <br /> REV:01/10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.