Task 1ME DMD DLH Drafting FUGRO ODCs Labor Total
<br /> $224 $198 $177 $125 $200
<br /> Task la Steel Tanks and Pipes
<br /> Inspection and Site Visit 8 10 10 $S00 $5,542 $5,642
<br /> Pipes Develop 25%& 50% Design, Submit g 2g 32 32 $17,000 $17,000
<br /> Anchors Develop 25.50% Design, Submit 12 28 40 36 16 $400 $23,012 $23,412
<br /> Specs, Develop Submit 90s 8 16 24 24 $400 $12,208 $12,608
<br /> Submit 100 for Bid g g g g $400 $5,792 $6,192
<br /> SubtotalTaskla 44 90 114 100 16 $1,300 $63,554 $64,854
<br /> Task lb Redwood Shores Pipe Bridges
<br /> Inspection, Data Collect and Site Visit g g $S00 $3,376 53,476
<br /> Evaluate Bridge / Pipes 16 8 24 8 511,016 $11,016
<br /> Report and Progress meeting g q 2 $2,984 $2,984
<br /> Develop 25% & 50% Design, Submit 8 16 16 20 $200 510,292 $10,492
<br /> Specs, Develop Submit 90s q g g 12 $200 $5,396 $5,596
<br /> Submit 100 for Bid Z Z q g $200 52,552 $2,752
<br /> SubtotalTask Ib 46 46 52 40 10 $700 $35,616 $36,316
<br /> Task 2 Wrson Reservoir
<br /> Interiorinspedion g g $100 $3,208 $3,308
<br /> Develop 25% & 50% Design, Submit 16 60 90 90 $400 $42,644 $43,044
<br /> Specs, Develop Submit 90s 16 40 50 50 5400 $26,604 $27,004
<br /> Submit 100 for Bid g 20 40 20 $400 $15,332 $15,732
<br /> Subtotal7ask2 48 120 188 160 0 $1,300 $87,788 589,088
<br /> Task 3 Equipment and Structures
<br /> Inspedion and Site Visit g g $3,000 $3,000
<br /> Develop25%&50%Design,Submit g 18 18 18 $300 $10,792 $11,092
<br /> Specs, Develop Submit 90s 4 8 8 16 $300 $5,896 $6,196
<br /> Submit 100 for Bid Z q q g $300 52,948 53,248
<br /> SubtotalTask3 14 38 38 42 0 5900 $22,636 $23,536
<br /> � ATTY/AGR/2012.001/G&E ENGINEERING Page 27 of 30
<br /> REV:01/10/12