Laserfiche WebLink
Task 1ME DMD DLH Drafting FUGRO ODCs Labor Total <br /> $224 $198 $177 $125 $200 <br /> Task la Steel Tanks and Pipes <br /> Inspection and Site Visit 8 10 10 $S00 $5,542 $5,642 <br /> Pipes Develop 25%& 50% Design, Submit g 2g 32 32 $17,000 $17,000 <br /> Anchors Develop 25.50% Design, Submit 12 28 40 36 16 $400 $23,012 $23,412 <br /> Specs, Develop Submit 90s 8 16 24 24 $400 $12,208 $12,608 <br /> Submit 100 for Bid g g g g $400 $5,792 $6,192 <br /> SubtotalTaskla 44 90 114 100 16 $1,300 $63,554 $64,854 <br /> Task lb Redwood Shores Pipe Bridges <br /> Inspection, Data Collect and Site Visit g g $S00 $3,376 53,476 <br /> Evaluate Bridge / Pipes 16 8 24 8 511,016 $11,016 <br /> Report and Progress meeting g q 2 $2,984 $2,984 <br /> Develop 25% & 50% Design, Submit 8 16 16 20 $200 510,292 $10,492 <br /> Specs, Develop Submit 90s q g g 12 $200 $5,396 $5,596 <br /> Submit 100 for Bid Z Z q g $200 52,552 $2,752 <br /> SubtotalTask Ib 46 46 52 40 10 $700 $35,616 $36,316 <br /> Task 2 Wrson Reservoir <br /> Interiorinspedion g g $100 $3,208 $3,308 <br /> Develop 25% & 50% Design, Submit 16 60 90 90 $400 $42,644 $43,044 <br /> Specs, Develop Submit 90s 16 40 50 50 5400 $26,604 $27,004 <br /> Submit 100 for Bid g 20 40 20 $400 $15,332 $15,732 <br /> Subtotal7ask2 48 120 188 160 0 $1,300 $87,788 589,088 <br /> Task 3 Equipment and Structures <br /> Inspedion and Site Visit g g $3,000 $3,000 <br /> Develop25%&50%Design,Submit g 18 18 18 $300 $10,792 $11,092 <br /> Specs, Develop Submit 90s 4 8 8 16 $300 $5,896 $6,196 <br /> Submit 100 for Bid Z q q g $300 52,948 53,248 <br /> SubtotalTask3 14 38 38 42 0 5900 $22,636 $23,536 <br /> � ATTY/AGR/2012.001/G&E ENGINEERING Page 27 of 30 <br /> REV:01/10/12 <br />