Laserfiche WebLink
Task JME DMD DLH Drafting FUGRO ODCs Labor Total <br /> Szza Si9s Sv� Slzs Szoo <br /> Task 4 Peninsula Tanks <br /> Develop Site Test Plan g $1,792 $1,792 <br /> Dig up piles, Site inspection 12 12 $5,088 SS,OS8 <br /> 551 Analysis 16 40 80 16 $100 $28,864 $28,964 <br /> EngineeringAssessment 12 12 $5,064 $5,064 <br /> Draft Report g g $3,376 $3,376 <br /> Meeting g 4 $2,592 $2,592 <br /> Final Report g 2 $2,192 $2,192 <br /> SubtotalTask4 72 60 80 0 34 $100 $48,968 549,068 <br /> Task 5. Bid Services g 8 8 16 2 $200 $7,192 $7,392 <br /> Task 6. Services During <br /> Construction 40 60 60 40 4 $400 $37,260 $37,660 <br /> Totals 272 422 540 398 66 $4,900 $303,014 $307,914 <br /> ATTY/AGR/2012.001/G&E ENGINEERING Page 28 of 30 <br /> REV:01 /10/12 <br />