My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.0 Project Organization <br /> Mr. John Eidinger will be the Project Manager for this work. He will also be technically <br /> responsible for laying out the project alternatives and design concepts, the structural <br /> pertormance criteria, the pros and cons of each alternative. <br /> Mr. Eidinger has working knowledge of Redwood City's water system. He has visited all <br /> sites and has knowledge of the structural issues related to each tank, structure and <br /> piece of equipment. <br /> 5.0 Project Schedule <br /> The schedule to pertorm the work is as follows: <br /> Notice to Proceed February 15, 2011 (target date). <br /> Submit draft Reports ( Tasks 1 b, 4) NTP + 3 months <br /> Submit 50% Plans, Specs & Estimates NTP + 6 months <br /> Submit 90% Plans, Specs & Estimates NTP + 9 months <br /> Submit 100% Plans, Specs & Estimates NTP + 11 months <br /> A master project schedule showing all review cycles and subtasks will be provided two <br /> weeks after Notice to Proceed. The target schedule is to have construction work for <br /> Task 1 be bid in 2012; Task 2 in 2013; and Task 3 in 2014. <br /> 6.0 Supplemental Information <br /> The City has existing steel tank coating specifications used for past tank painting. The <br /> Exterior prime coats on both Cambridge tanks are lead based. The city may choose to <br /> recoat the ceilings (inside of roo� for both Cambridge tanks in the summer of 2012; this <br /> work may be added to the Task 1 bid package. <br /> ATTY/AGR/2012.001lG&E ENGINEERING Page 29 of 30 <br /> REV:01 /10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.