My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rate Schedule, Reimbursable Expenses and Payment <br /> G&E ENGINEERING SYSTEMS INC.(Consultant) <br /> RATE SCHEDULE 2012 <br /> Effective through December 31, 2013 <br /> Engineering Rate Schedule (Regular and OveRime Hours) <br /> Principal $224.00 <br /> Senior Technical Specialist $198.00 <br /> Technical Specialist $177.00 <br /> Senior Engineer $156.00 <br /> Engineer $135.00 <br /> Drafter $125.00 <br /> Administrative $62.00 <br /> Labor costs include salary, fringes, overhead, general and administrative, and profit. Labor costs are <br /> valid through December 31, 2013, and increase by 3% for the twelve months following. Rates for <br /> subsequent calendar years are subject to annual changes. . <br /> Reimbursable Expenses <br /> a. Mileage standard IRS rate per mile within the San Francisco Bay Area <br /> b. Expenses of travel, subsistence and communications outside of the San Francisco Bay Area, in <br /> connection with the Project. Air travel will be by coach rates. <br /> c. Expense of the reproduction and messenger delivery of project work and other documents. <br /> d. Expense of outside services including sub-consultants, mock-ups, models, special drafting, display <br /> renderings, graphic art work, and photographic work at cost plus 10%. <br /> e. Expense of special supplies and materials. Color print media shall be charged at $0.75 per sheet (A <br /> size) or $1.50 per sheet (B size) or $1.50 per square foot for large format sizes (D or E size). Large format <br /> (D or E size) black and white drawings shall be charged at $1.00 per square foot. <br /> f. Expense of computers. Computer costs include rates for computer-based engineering calculations and <br /> CAD drafting. No charge for computers used for word-processing or other overhead activities. <br /> ATTY/AGR/2012.001/G&E ENGINEERING Page 30 of 30 <br /> REV:01/10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.