Expanded Task 1: Task 1c - Redwood Shores Pipeline Improvements <br /> Consultant shall develop contract documents to seismically-upgrade the large diameter steel <br /> pipe (backbone steel pipe, 16" to 24" diameter) in and near Redwood Shores. The intent of <br /> these modifications is to install additional isolation valves (about 6 locations) and bypass pipes <br /> (at 10 locations), with the intent to be able to sectionalize the pipe network in Redwood Shores <br /> after a large earthquake, and thus be able to restore service as rapidly as possible to as many <br /> customers as possible. <br /> The woric plan below is meant to follow the work as envisioned in the FEMA grant applications. <br /> In other words, the work is tailored to meet the intent of the FEMA grant application, so that the <br /> costs can be approved by FEMA. Should additional work arise during the course of the effort <br /> that is not meant to be funded by FEMA, this work would be addressed under separate <br /> accounts so that Redwood City can readiy assign the suitable costs between FEMA-funded and <br /> non-FEMA funded work. <br /> Required Submittals: <br /> 25% Design Submittal <br /> Consultant shall review the locations of all existing Redwood Shores backbone pipe <br /> valve locations. Consultant will use original design drawings for this review. We will <br /> create a map showing these locations, showing the backbone pipes and valve locations. <br /> We will review the available Redwood Shores subsurtace boring information and <br /> geologic conditions to rank the relative hazard and pipeline reliability for the backbone <br /> pipe. <br /> Consultant will then walk down each site with these valves in Redwood Shores, to <br /> examine the ease for construction of new bypass pipes and outlets. We will look for <br /> traffic patterns, availability of nearby sidewalks, cross streets and driveways. We will <br /> then prepare a constructability matrix that ranks the ease of construction, relative <br /> difficulty for traffic during construction, and efficacy of the upgrade location with regards <br /> to improving post-earthquake reliability. <br /> We will prepare a report that summarizes the possible locations for installation of new <br /> valves (up to about 6 locations) and bypass pipes (10 locations). We will meet with <br /> Redwood City to discuss these locations (including a drive through) and select the final <br /> locations for implementation. <br /> 50% Design Submittal <br /> We will prepare drawings and specifications for the designs to be implemented of the <br /> type and at the locations agreed to in the 25% submittal. <br /> ATTY/AGR/2014/AMENDMENTS/AMEND N0.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 4 of 13 <br />