My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Deliverables: <br /> • Drawing list that identifies all proposed Drawings and Specifications to be <br /> delivered. <br /> • Location plan drawings for each site that show which major components <br /> are to be upgraded. <br /> • Drawings (11 x17) showing details (50% complete). Preliminary <br /> calculations (partial as available). Stamped "not for construction". <br /> • Overall scope of construction work — description and updated cost <br /> estimate. <br /> • Proposed specifications and standards. Redwood City shall supply "boiler <br /> plate" sections of the standard specifications as commonly used for <br /> similar work by Redwood City, from which Consultant shall modify as <br /> needed for this project. Consultant will develop all technical <br /> specifications. <br /> 90% Design Submittal and Review <br /> Consultant shall develop complete (90%) design plans and specifications for the project <br /> for Redwood City final review. Detailed design shall conform to all applicable water <br /> industry codes and Redwood City design standards; and shall be stand-alone bid <br /> documents. As delivered, the 90% documents shall be ready for advertisement and <br /> competition, to the extent practical, subject to any changes the Redwood City may <br /> identify or limited open issues. <br /> Consultant shall prepare an updated draft Engineer's Cost Estimate for construction <br /> activities. <br /> Consultant shall perform an internal QA audit of the designs. <br /> Consultant shall assist Redwood City in responding to the 90% Design Review <br /> Submittal comments from Redwood City Operations, Maintenance, and Engineering <br /> staff. <br /> Deliverables. <br /> • One set (11" x 17") of drawings and specifications (electronic) shall be <br /> provided to Redwood City for review at the 90% level of completion. <br /> Consultant shall have performed its internal quality control prior to this <br /> submittal. Stamped "not for construction". <br /> • Electronic files on CD diskette (or delivered by email) to Redwood City. <br /> • Preliminary Engineer's Estimate. Estimate shall include a breakdown of <br /> labor, material quantities, and unit prices. The estimate shall list all <br /> assumptions including overhead and profit, subcontract mark-ups, tax <br /> and contingency. Support documents shall be submitted with the cost <br /> estimate. <br /> • One set of 90% Calculations, <br /> ATTY/AGR/2014/AMENDMENTS/AMEND N0.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.