My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item Number of Potential Drawing List for Contract Documents <br /> Drawin s <br /> Cover Sheet 1 <br /> Technical 2 1 sheet if pile modifications are not adopted <br /> S ecifications <br /> Pipe 2 <br /> modifications <br /> Pile 2 Plan of new pile locations. Details of new pipes <br /> modifications (drilled piers/caissons). Details of attachment to <br /> existin foundations <br /> Total 7 <br /> Table 2. Peninsula 2 Drawing List (Potential) <br /> To the maximum extent, Consultant will re-use available Redwood City drawings (TIF <br /> and PDF) as background information, with new details to be shown on suitable new <br /> layers, and existing information shown "grayed". Site plans will be based on available <br /> information shown on available Redwood City drawings. New potholing or survey is not <br /> included as it is not warranted for the seismic upgrade work, but will be included as part <br /> of the bid documents for the contractor to implement. <br /> Deliverables: <br /> • Tech memo with calculations showing seismically-upgraded tank (with <br /> added external piles) pertormance. <br /> • Drawing list that identifies all proposed Drawings and Specifications to be <br /> delivered. <br /> • Location plan drawings for the tank showing pipeline and (optionally) pile <br /> components are to be upgraded. <br /> • Drawings (11 x17) showing details (50% complete). Preliminary <br /> calculations (partial as available). Stamped "not for construction". <br /> • Overall scope of construction work — description and updated cost <br /> estimate. <br /> • Proposed specifications and standards. Redwood City shall supply "boiler <br /> plate" sections of the standard specifications as commonly used for <br /> similar work by Redwood City, from which Consultant shall modify as <br /> needed for this project. Consultant will develop all technical <br /> specifications. <br /> 90% Design Submittal and Review <br /> Based on the 50% submittal, Redwood City shall direct Consultant to proceed with all <br /> (pipes and piles) or part (pipes only) upgrades. <br /> ATTY/AGR/2014/AMENDMENTS/AMEND NO.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 8 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.