My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Consultant shall develop complete (90%) design plans and specifications for the project <br /> for Redwood City final review. Detailed design shall conform to all applicable water <br /> industry codes and Redwood City design standards; and shall be stand-alone bid <br /> documents. As delivered, the 90% documents shall be ready for advertisement and <br /> competition, to the extent practical, subject to any changes the Redwood City may <br /> identify or limited open issues. <br /> Consultant shall prepare an updated draft Engineer's Cost Estimate for construction <br /> activities. <br /> Consultant shall pertorm an internal QA audit of the designs. <br /> Consultant shall assist Redwood City in responding to the 90% Design Review <br /> Submittal comments from Redwood City Operations, Maintenance, and Engineering <br /> staff. <br /> Deliverables. <br /> • One set (11" x 17") of drawings and specifications (electronic) shall be <br /> provided to Redwood City for review at the 90% level of completion. <br /> Consultant shall have performed its internal quality control prior to this <br /> submittal. Stamped "not for construction". <br /> • Electronic files on CD diskette (or delivered by email) to Redwood City. <br /> • Preliminary Engineer's Estimate. Estimate shall include a breakdown of <br /> labor, material quantities, and unit prices. The estimate shall list all <br /> assumptions including overhead and profit, subcontract mark-ups, tax <br /> and contingency. Support documents shall be submitted with the cost <br /> estimate. <br /> • One set of 90% Calculations. <br /> 100% Design <br /> Redwood City will perform a detailed design review of the 90% submittal. Consultant will <br /> meet with Redwood City staff to review comments on the 90% review. <br /> Consultant shall make all necessary revisions and modifications to the 90% Design as <br /> agreed upon befinreen Redwood City and Consultant. These revisions and modifications <br /> will be incorporated into the 100% Finalized Plans, Calculations and Specifications. All <br /> comments shall be either incorporated, or responded to if not incorporated. Consultant <br /> shall finalize all construction documents for bidding (i.e., plans and specifications) and <br /> shall finalize the Engineer's Cost Estimate. <br /> ATTY/AGR/2014/AMENDMENTS/AMEND N0.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 9 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.