Laserfiche WebLink
4.0 Proiect Orqanization <br /> Mr. John Eidinger will be the Project Manager for this work. He will also be technically <br /> responsible for the work, and will stamp all drawings and specifications. He is a <br /> registered California Professional Engineer and Structural Engineer with 35 years <br /> experience. <br /> Mr. Donald Duggan will lead the design (civil, structural, pipes) effort. He is a registered <br /> California Professional Engineer with 37 years experience. <br /> Ms. Darlene Holston will support the design effort. She is a registered California <br /> Professional Engineer with 32 years experience. <br /> Ms. Pavla Furminkova will provide drafting as part of the design effort. <br /> Resumes are available upon request. <br /> 5.0 Proiect Schedule <br /> The schedule to pertorm the work is as follows: <br /> Notice to Proceed April 7 2014 (target date). <br /> Submit draft reports (Tasks 1, 2b) NTP + 2 months <br /> Submit 50% Plans, Specs & Estimates NTP + 3 months <br /> Submit 90% Plans, Specs & Estimates NTP + 6 months <br /> Submit 100% Plans, Specs & Estimates NTP + 8 months <br /> The target schedule is to have construction work for Task 4 & 8 be bid in 2014. <br /> Task 6. It is intended that all construction work on all bid packages (8 total) will be <br /> complete by December 31, 2016. <br /> ATTY/AGR/2014/AMENDMENTS/AMEND N0.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 12 of 13 <br />