My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-02-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-02-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2012 4:08:32 PM
Creation date
2/23/2012 4:38:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
2/27/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.B. - Page 4 <br />EXHIBIT B - 2 <br />OFF -SITE <br />DISCRETE COMPONENTS OF DISTRICT FACILITIES <br />AND RELATED BUDGETED COSTS <br />Note: In this exhibit, each highlighted heading is a facility (i.e. planning and design costs <br />previously paid, sanitary sewer improvements, domestic water improvements) and each numbered line <br />listed below a Facility is a discrete component thereof (ie "RW No. 1" and "Roadway No. 2" are each a <br />discrete component). <br />Description <br />Costs <br />PLANNING & DESIGN COSTS PREVIOUSLY PAID <br />DESIGN/PERMITTING APPROVALS <br />Costs to Date <br />PD No. 1: Legal Fees <br />10,000.00 <br />PD No. 2: Redwood City Plan Review Fees <br />84,825.00 <br />PD No. 3: Performance & Payment Bond Reimbursement Lewis & <br />Tibbitts <br />3,162.00 <br />Total <br />97,987.00 <br />STUDIES/ENGINEERING/FEES <br />Costs to date <br />SE No, 1: Surve /PUE's <br />7,500.00 <br />SE No. 2: Geotechnical Investigation & Report <br />23,529.00 <br />SE No. 3: Civil Engineering Design KPFF) <br />382,591.00 <br />SE No. 4: Landscape & Irrigation Design Guzzardo Partnership) <br />17,932.00 <br />SE No. 5: Special Consultants <br />6,818.00 <br />SE No. 6: PG &E Electrical Design Fees <br />54,000.00 <br />SE No. 7: PG &E Gas Design Fees <br />25,000.00 <br />SE No. 8: PG &E Joint Trench Design and Form B <br />8,250.00 <br />SE No. 9: AT &T Telephone Cabinet Relocation <br />135,586.00 <br />SF. No. 10: Management Fee <br />100,000.00 <br />Total <br />760,666.00 <br />BAIR ISLAND ROAD RECONSTRUCTION <br />PHASE 1 Sta. 0 +00 to Sta. 20 +25 <br />Costs to Complete <br />GENERAL CONDITIONS: <br />GC No. 1: Legal Fees <br />10,000.00 <br />GC No. 2: Civil Engineering RFI's & Construction Observations <br />52,400.00 <br />GC No. 3: Geotechnical Testing & Observations <br />34,500.00 <br />GC No. 4: Redwood City Inspections <br />20,000.00 <br />GC No. 5: Erosion Control /SWPPP /BMP <br />30,400.00 <br />GC No. 5: Dewatering <br />30,000.00 <br />GC No, 6: Construction Staking <br />1.7,000.00 <br />GC No. T Traffic Control <br />20,000.00 <br />GC No. 8: Wet Utility Demolition & Slurry Filling <br />80,290.00 <br />GC No. 9: Temporary Utilities & Services, Printing & Reimbursables, <br />Office Expenses, Etc. <br />20,000.00 <br />Subtotal <br />314,590.00 <br />GENERAL CONSTRUCTION ROADWAY: <br />GCR No. 1: Install the future 20" water main and related appurtenances <br />under the Bayshore Freeway (State Hwy 101), extending under the new round- <br />about and tying -in at the new tee located at Station 9 +16.84. Reference Drawing <br />No. 10.1. <br />29,232.00 <br />B2 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.