6.2.B. - Page 5
<br />GCR No. 2: Clearing & Grubbing
<br />40,450.00
<br />GCR No. 3: Construction of Detour Road, including Temporary Signage
<br />94,554.00
<br />& Stripin
<br />GCR No. 4: Demolition and Removal of Detour Road, including
<br />31,518.00
<br />Temporary Si na e & Stri in
<br />Subtotal
<br />166,522.00
<br />DISCRETE COMPONENTS:
<br />Storm Drainage Improvements: All labor, material and equipment pertaining
<br />Costs to
<br />to the trenching and installation of the storm drainage pipes, manholes, tie -ins to
<br />Complete
<br />existing drain inlets and service laterals, tie -in to the existing storm water pump
<br />station and tie -ins to the infiltration galleries as detailed on the KPFF drawings 8.1,
<br />8.2 and 8.3 and approved by the City of Redwood City, Engineering & Construction,
<br />on 14 October 2009.
<br />SD No. 1: That portion of the work at the tie -in to the existing storm water lift
<br />65,960.00
<br />station at storm drain manhole #13 to storm drain manhole #10, including tie -in to the
<br />existing drain inlet. Reference Drawing No. 8.1.
<br />SD No. 2: That portion of the work from storm drain manhole #10 to storm
<br />32,284.00
<br />drain manhole #9, including tie -in to the existing drain inlet. Reference Drawings No.
<br />8.1 and 82.
<br />SD No. 3: That portion of the work from storm drain manhole #9 to storm
<br />53,793.00
<br />drain manhole #6, including tie -in to the existing drain inlet. Reference Drawing No.
<br />8.2.
<br />SD No. 4: That portion of the work from storm drain manhole #6 to storm
<br />63,085.00
<br />drain manhole #3, including tie -in to the existing drain inlet and existing service
<br />lateral. Reference Drawings No. 8.2 and 8.3. End of Work for Phase 1 Sta. 20 +50,
<br />SD No. 5: That portion of the work at the round -about to connect the
<br />8,590.00
<br />landscape drainage and infiltration galleries to the new storm drainage system.
<br />Reference Drawing No. 8.1.
<br />Subtotal
<br />223,712.00
<br />Sanitary Sewer Improvements: All labor, material and equipment pertaining
<br />Costs to
<br />to the trenching and installation of the sanitary sewer pipes, manholes, and tie -ins to
<br />Complete
<br />existing service laterals as detailed on the KPFF drawings 9.1, 9.2, 9.3 and 9.4 and
<br />approved by the City of Redwood City, Engineering & Construction, on 14 October
<br />2009.
<br />SS No. 1: That portion of the work from the tie -in to existing manhole sanitary
<br />64,1 84.00
<br />sewer manhole #3, including new service lateral and sanitary sewer manhole #3A.
<br />Reference Drawings 9.1 and 9.2.
<br />SS No. 2: That portion of the work from sanitary sewer manhole #3 to
<br />52,371.00
<br />sanitary sewer manhole #5, including tie -in to existing service lateral. Reference
<br />Drawing 9.2.
<br />SS No. 3: That portion of the work front sanitary sewer manhole #5 to
<br />35,998.00
<br />sanitary sewer manhole #7, including tie -in to existing service lateral. Reference
<br />Drawings No. 9.2 and 9.3. End of Work for Phase 1 Sta. 20 +50.
<br />Subtotal
<br />152,553.00
<br />Domestic Water Improvements: All labor, material and equipment pertaining
<br />Costs to
<br />to the trenching and installation of the sanitary sewer pipes, manholes, and tie -ins to
<br />Complete
<br />existing service laterals as detailed on the KPFF drawings 10.1, 10.2,10.3,10.4 and 10.5
<br />and approved by the City of Redwood City, Engineering & Construction, on 14
<br />October 2009.
<br />DW No. 1: That portion of the work from Sta. 21 +41.47 to Sta. 13 +01.85,
<br />208,014.00
<br />including all tees, butterfly valves, air release valves, blow off valves, new fire
<br />hydrant assemblies, new service lateral to One Marina, tie -in to existing 2 "service,
<br />B2 -2