6.2.B. - Page 5 <br />GCR No. 2: Clearing & Grubbing <br />40,450.00 <br />GCR No. 3: Construction of Detour Road, including Temporary Signage <br />94,554.00 <br />& Stripin <br />GCR No. 4: Demolition and Removal of Detour Road, including <br />31,518.00 <br />Temporary Si na e & Stri in <br />Subtotal <br />166,522.00 <br />DISCRETE COMPONENTS: <br />Storm Drainage Improvements: All labor, material and equipment pertaining <br />Costs to <br />to the trenching and installation of the storm drainage pipes, manholes, tie -ins to <br />Complete <br />existing drain inlets and service laterals, tie -in to the existing storm water pump <br />station and tie -ins to the infiltration galleries as detailed on the KPFF drawings 8.1, <br />8.2 and 8.3 and approved by the City of Redwood City, Engineering & Construction, <br />on 14 October 2009. <br />SD No. 1: That portion of the work at the tie -in to the existing storm water lift <br />65,960.00 <br />station at storm drain manhole #13 to storm drain manhole #10, including tie -in to the <br />existing drain inlet. Reference Drawing No. 8.1. <br />SD No. 2: That portion of the work from storm drain manhole #10 to storm <br />32,284.00 <br />drain manhole #9, including tie -in to the existing drain inlet. Reference Drawings No. <br />8.1 and 82. <br />SD No. 3: That portion of the work from storm drain manhole #9 to storm <br />53,793.00 <br />drain manhole #6, including tie -in to the existing drain inlet. Reference Drawing No. <br />8.2. <br />SD No. 4: That portion of the work from storm drain manhole #6 to storm <br />63,085.00 <br />drain manhole #3, including tie -in to the existing drain inlet and existing service <br />lateral. Reference Drawings No. 8.2 and 8.3. End of Work for Phase 1 Sta. 20 +50, <br />SD No. 5: That portion of the work at the round -about to connect the <br />8,590.00 <br />landscape drainage and infiltration galleries to the new storm drainage system. <br />Reference Drawing No. 8.1. <br />Subtotal <br />223,712.00 <br />Sanitary Sewer Improvements: All labor, material and equipment pertaining <br />Costs to <br />to the trenching and installation of the sanitary sewer pipes, manholes, and tie -ins to <br />Complete <br />existing service laterals as detailed on the KPFF drawings 9.1, 9.2, 9.3 and 9.4 and <br />approved by the City of Redwood City, Engineering & Construction, on 14 October <br />2009. <br />SS No. 1: That portion of the work from the tie -in to existing manhole sanitary <br />64,1 84.00 <br />sewer manhole #3, including new service lateral and sanitary sewer manhole #3A. <br />Reference Drawings 9.1 and 9.2. <br />SS No. 2: That portion of the work from sanitary sewer manhole #3 to <br />52,371.00 <br />sanitary sewer manhole #5, including tie -in to existing service lateral. Reference <br />Drawing 9.2. <br />SS No. 3: That portion of the work front sanitary sewer manhole #5 to <br />35,998.00 <br />sanitary sewer manhole #7, including tie -in to existing service lateral. Reference <br />Drawings No. 9.2 and 9.3. End of Work for Phase 1 Sta. 20 +50. <br />Subtotal <br />152,553.00 <br />Domestic Water Improvements: All labor, material and equipment pertaining <br />Costs to <br />to the trenching and installation of the sanitary sewer pipes, manholes, and tie -ins to <br />Complete <br />existing service laterals as detailed on the KPFF drawings 10.1, 10.2,10.3,10.4 and 10.5 <br />and approved by the City of Redwood City, Engineering & Construction, on 14 <br />October 2009. <br />DW No. 1: That portion of the work from Sta. 21 +41.47 to Sta. 13 +01.85, <br />208,014.00 <br />including all tees, butterfly valves, air release valves, blow off valves, new fire <br />hydrant assemblies, new service lateral to One Marina, tie -in to existing 2 "service, <br />B2 -2 <br />