6.2.B. - Page 6 <br />and tie -in to existing 1" service. reference Drawing 10.1 and 10.2. <br />DW No. 2: That portion of the work from Sta. 13 +01.85 to Sta. 20 +16.57, <br />174,138.00 <br />including all butterfly valves, gate valves, air release valves, new fire hydrant <br />assemblies, and tie -in to existing fire service lateral. Reference Drawings 10.2 and <br />10.3. End of Work for Phase 1 Sta. 20 +50. <br />Subtotal <br />382,026.00 <br />Recycled Water Improvements: All labor, material and equipment pertaining <br />Costs to <br />to the trenching and installation of the sanitary sewer pipes, manholes, and tie -ins to <br />Complete <br />existing service laterals as detailed on the KPFF drawings 11.1, 11.2,11.3, and 11.4 and <br />approved by the City of Redwood City, Engineering & Construction, on 14 October <br />2009. <br />RW No. 1: That portion of the work from Sta. 20 +58.91 to Sta. 13 +33.58, <br />82,766.00 <br />including all tees, gate valves, blow off valves, air release valves, and new service <br />lateral to One Marina. Reference Drawings No. 11.1 and 11.2. <br />RW No. 2: That portion of the work from Sta. 13 +33.58 to Sta. 20 +23.06, <br />69,238.00 <br />including all air release valves, blow off valves, gate valves, meter box, and new <br />service laterals. Reference Drawings 11.2 and 11.3. End of Work for Phase 1 Sta. <br />20 +50. <br />Subtotal <br />152,004.00 <br />Concrete Improvements: All labor, material and equipment pertaining to the <br />Costs to <br />demolition of existing concrete and the forming, placing, stripping of new concrete as <br />Complete <br />detailed on the KPFF drawings 7.1, 7.2, 7.3, and 7.4 and approved by the City of <br />Redwood Ci , Engineering & Construction, on 14 October 2009. <br />Concrete No. 1: That portion of the work defined as all new curb, gutter, curb <br />135,371.00 <br />cuts at filtration planters, truncated HC domes and driveway approaches. <br />Concrete No. 2: That portion of the work defined as the new round - about. <br />129,985.00 <br />Concrete No. 3: That portion of the work new bicycle path. <br />77,149.00 <br />Concrete No. 4: That portion of the work new sidewalk. <br />77,103.00 <br />Subtotal <br />419,608.00 <br />Roadway Improvements: All labor, material and equipment pertaining to the <br />Costs to <br />demolition of existing AC paving and related base material and the excavation, <br />Complete <br />grading, placement and compaction of new Class II AB base, new AC paving, new <br />striping and signage as detailed on the KPFF drawings 7.1, 7.2, 7.3, 7.4, 12.1, 12.2 and <br />12.3 and approved by the City of Redwood City, Engineering & Construction, on 14 <br />October 2009. <br />Roadway No. 1: That portion of the work defined as excavation, grading, <br />198,522.00 <br />Class II AB base rock, AC paving for the entire roadway. <br />Roadway No. 2: That portion of the work defined as permanent striping and <br />17,285.00 <br />signage, <br />Subtotal <br />215,807.00 <br />Street Light & Pedestrian Light Improvements: All labor, material and <br />Costs to <br />equipment pertaining to the demolition of existing street lights, installation of new <br />Complete <br />street lights, new pedestrian lights, conduits, pull boxes, electrical conductors and <br />related appurtenances as detailed on KPFF drawings 16.1,16.2, and 16.3 and approved <br />by the City of Redwood Ci , Engineering & Construction, on 14 October 2009. <br />SL /PL No. 1: That portion of the work defined as demolition of existing street <br />72,724.00 <br />lights, installation of new street lights and related pull boxes, conduit and electrical <br />conductor, and tie -in to existing service. <br />SL /PL No. 2: That portion of the work defined as new pedestrian lights and <br />88,884.00 <br />related pull boxes, conduit and electrical conductor. <br />Subtotal <br />161,608.00 <br />PG &E Gas & Electrical Improvements: All labor, material and equipment <br />Costs to <br />B2 -3 <br />