6.2.B. - Page 6
<br />and tie -in to existing 1" service. reference Drawing 10.1 and 10.2.
<br />DW No. 2: That portion of the work from Sta. 13 +01.85 to Sta. 20 +16.57,
<br />174,138.00
<br />including all butterfly valves, gate valves, air release valves, new fire hydrant
<br />assemblies, and tie -in to existing fire service lateral. Reference Drawings 10.2 and
<br />10.3. End of Work for Phase 1 Sta. 20 +50.
<br />Subtotal
<br />382,026.00
<br />Recycled Water Improvements: All labor, material and equipment pertaining
<br />Costs to
<br />to the trenching and installation of the sanitary sewer pipes, manholes, and tie -ins to
<br />Complete
<br />existing service laterals as detailed on the KPFF drawings 11.1, 11.2,11.3, and 11.4 and
<br />approved by the City of Redwood City, Engineering & Construction, on 14 October
<br />2009.
<br />RW No. 1: That portion of the work from Sta. 20 +58.91 to Sta. 13 +33.58,
<br />82,766.00
<br />including all tees, gate valves, blow off valves, air release valves, and new service
<br />lateral to One Marina. Reference Drawings No. 11.1 and 11.2.
<br />RW No. 2: That portion of the work from Sta. 13 +33.58 to Sta. 20 +23.06,
<br />69,238.00
<br />including all air release valves, blow off valves, gate valves, meter box, and new
<br />service laterals. Reference Drawings 11.2 and 11.3. End of Work for Phase 1 Sta.
<br />20 +50.
<br />Subtotal
<br />152,004.00
<br />Concrete Improvements: All labor, material and equipment pertaining to the
<br />Costs to
<br />demolition of existing concrete and the forming, placing, stripping of new concrete as
<br />Complete
<br />detailed on the KPFF drawings 7.1, 7.2, 7.3, and 7.4 and approved by the City of
<br />Redwood Ci , Engineering & Construction, on 14 October 2009.
<br />Concrete No. 1: That portion of the work defined as all new curb, gutter, curb
<br />135,371.00
<br />cuts at filtration planters, truncated HC domes and driveway approaches.
<br />Concrete No. 2: That portion of the work defined as the new round - about.
<br />129,985.00
<br />Concrete No. 3: That portion of the work new bicycle path.
<br />77,149.00
<br />Concrete No. 4: That portion of the work new sidewalk.
<br />77,103.00
<br />Subtotal
<br />419,608.00
<br />Roadway Improvements: All labor, material and equipment pertaining to the
<br />Costs to
<br />demolition of existing AC paving and related base material and the excavation,
<br />Complete
<br />grading, placement and compaction of new Class II AB base, new AC paving, new
<br />striping and signage as detailed on the KPFF drawings 7.1, 7.2, 7.3, 7.4, 12.1, 12.2 and
<br />12.3 and approved by the City of Redwood City, Engineering & Construction, on 14
<br />October 2009.
<br />Roadway No. 1: That portion of the work defined as excavation, grading,
<br />198,522.00
<br />Class II AB base rock, AC paving for the entire roadway.
<br />Roadway No. 2: That portion of the work defined as permanent striping and
<br />17,285.00
<br />signage,
<br />Subtotal
<br />215,807.00
<br />Street Light & Pedestrian Light Improvements: All labor, material and
<br />Costs to
<br />equipment pertaining to the demolition of existing street lights, installation of new
<br />Complete
<br />street lights, new pedestrian lights, conduits, pull boxes, electrical conductors and
<br />related appurtenances as detailed on KPFF drawings 16.1,16.2, and 16.3 and approved
<br />by the City of Redwood Ci , Engineering & Construction, on 14 October 2009.
<br />SL /PL No. 1: That portion of the work defined as demolition of existing street
<br />72,724.00
<br />lights, installation of new street lights and related pull boxes, conduit and electrical
<br />conductor, and tie -in to existing service.
<br />SL /PL No. 2: That portion of the work defined as new pedestrian lights and
<br />88,884.00
<br />related pull boxes, conduit and electrical conductor.
<br />Subtotal
<br />161,608.00
<br />PG &E Gas & Electrical Improvements: All labor, material and equipment
<br />Costs to
<br />B2 -3