6.2.B. - Page 7 <br />pertaining to the joint trench trenching and backfillin& installation of underground <br />Complete <br />electrical vaults, electrical concrete pads, conduits, 6" gas main, and related <br />421,878.00 <br />appurtenances as detailed on the PG &E drawings .... and the Joint Trench drawings <br />... drawings 11.1, 11.2, 11.3, and 11.4 and approved by the City of Redwood City, <br />63,281.70 <br />Engineering & Construction, on 14 October 2009. <br />PG &E No. 1: That portion of the work for the joint trench, including <br />89,918.00 <br />excavation, backfill and conduits. <br />PG &E No. 2: That portion of the work for the furnishing & installation of the <br />63,618.00 <br />concrete substructures and at grade concrete pads for the new electrical service. <br />PG &E No. 3: That portion of the work to furnish and install the new 6" gas <br />48,900.00 <br />main in the joint trench. <br />Subtotal <br />202,436.00 <br />Landscape & Irrigation Improvements: All labor, material and equipment <br />Costs to <br />pertaining to the installation of filtration gallery excavation and backfilling, <br />Complete <br />underground drainage piping, drainage rock, landscape plantings, soil amendments <br />and fertilizers, irrigation system with controller and fine grading as detailed on The <br />Guzzardo Partnership drawings... <br />L &I No. 1: That portion of the work for a complete irrigation system. <br />30,750.00 <br />L &I No. 2: That portion of the work for the excavation and backfill of the <br />74,237.00 <br />infiltration galleries and all related under ound drainage piping and drainage rock. <br />L &I No. 3: That portion of the work for all plantings and soil amendments. <br />55,355.00 <br />Subtotal <br />160,342.00 <br />Construction Management Fee <br />15% of Subtotal Costs to Complete <br />382,681.20 <br />Contingenc <br />5% of Subtotal Costs to Complete and CM Fee <br />146,694.46 <br />TOTALPHASEI <br />Total <br />3,080,583, <br />66 <br />BAIR ISLAND ROAD RECONSTRUCTION <br />FUTURE PHASE Sta. 20 +25 to Property Line <br />Estimated <br />Cost to Complete <br />General Conditions &General Construction for Future Phase <br />421,878.00 <br />Construction Mana ement Fee <br />15% of General Conditions & General Construction for Future Phase <br />63,281.70 <br />Contingency <br />5% of General Conditions & General Construction for Future Phaseand CM <br />Fee <br />24,257.99 <br />TOTAL PHASE 1 <br />Total <br />509,417.69 <br />