My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 P-2165
RedwoodCity
>
City Clerk
>
Resolutions
>
Port Commission
>
2012
>
Res12 P-2165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2012 2:46:49 PM
Creation date
3/6/2012 2:46:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Port Authority
Date
2/22/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
) <br /> � �� ��`�j �. � <br /> �4� t ,� I ...� 4.','� <br /> \�—�' � :; <br /> e.i <br /> 103 References - 20 points <br /> Please provide current contact references, including phone numbers, addresses, and emails, for the 8 <br /> reference projects provided in the Qualifications and Experience Portion. The Port will make <br /> reasonable attempts to contact references. If a reference cannot be contacted, no points will be <br /> awazded for that reference. <br /> 10.4 Essential Requirements for Contractor Qualification - Pass / Fail <br /> The essential requirements for Contractor qualification are attached to this RFQ as Appendix A. The <br /> Contractor will be immediately disqualified if the answer to any of quesrions 1 through 5 and 10 <br /> through 11 is "no". The Contractor will be immediately disqualified if the answer to any of questions <br /> 6 through 9 and 12 is "yes". If the answer to question 8 is "yes," and if debannent would be the sole <br /> reason for denial of pre-qualification, any pre-qualification issued will exclude the debannent period. <br /> 10.5 Business History, Performance, Safety, and Workers Comp - 25 points <br /> Additional, scorable questions aze attached to this RFQ as Appendiac B. These questions cover <br /> business history, organizational performance, compliance with occupational safety and health laws, <br /> workers' compensarion, and other labor legislation. The scoring for each question follows the <br /> question. There are a total of 129 available points in this section. To arrive at the point total to be used <br /> in the RFQ, the awazded points from Appendix B will be pro-rated. <br /> 10.6 RFP Selection Criteria <br /> The qualification score based upon this RFQ will carry over to the RFP selection criteria. Final <br /> selection will be based upon the following weighted measures: <br /> • RFQ Qualification Score - 25% <br /> • Technical Approach - 25% <br /> • Cost - 50% - The low bid will be awazded 50 points. Poinu will be awazded for other bids <br /> according to the following formula: <br /> Poinu Awarded =(1 -(Proposed Bid - Low Bid)/(Low Bid)) * 50 <br /> Additional detail on how these scores will be calculated will be contained in the RFP. <br /> 11 Format of Qualification Statements <br /> The cover letter, executive summary, qualifications and experience, and references portion of the <br /> RFQ response should be limited to 30 single sided pages or 15 double sided pages. Responses to <br /> Appendix A, B, C, and D do not count towazds the page total. Five copies of the qualification <br /> statement must be delivered to the Port by 5:00 pm on Friday, Mazch 16, 2012. Please address <br /> qualification statements to: <br /> aeqe n w n <br /> 'c J „ <br /> ���J <br />
The URL can be used to link to this page
Your browser does not support the video tag.