My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt01 Green Valley Corp
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2001
>
Agmt01 Green Valley Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:52:15 PM
Creation date
4/9/2002 10:37:55 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Valley Corp. DBA Barry Swenson Builder
PROJECT NAME
Twin Dolphin bridge
RMP File Number
304
Date
8/29/2001
Reso Ref
14317
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Improvements. Upon written notice to proceed given by City, Builder <br />shall, at Builder's own cost and expense, construct all of the improvements <br />("Bridge Improvements"), furnish all the materials, and do all the work hereinafter <br />described in accordance with, and as provided for, in the plans and <br />specifications prepared for Builder by People Associates (Structural Engineer), <br />entitled, "Twin Dolphin Drive Bridge" (collectively, the "Plans/Specifications"), and <br />in accordance with City's specifications entitled, "Engineering Standards-City of <br />Redwood City" (the "Standards"), in effect as of the date of final approval by City <br />of the Plans/Specifications, which Plans/Specifications and Standards are on file <br />in the office of the City Engineer and are incorporated herein by reference. The <br />Bridge Improvements shall also be constructed in strict compliance with the <br />provisions of Article VII, Chapter 29 of the Code of the City of Redwood City (the <br />"Code Provisions"), also incorporated herein by reference, in the event of a <br />conflict between said Plans/Specifications, Standards, and Code Provisions with <br />respect to the standard for a particular improvement, the strictest standard shall <br />govern. <br /> <br /> Builder shall complete all of the Bridge Improvements, subject to such <br />exceptions and time extensions allowable under paragraph 11, according to a <br />schedule approved by City; provided that the Bridge Improvements shall be <br />completed no later than December 31, 2002. The Bridge Improvements shall <br /> <br />include, but are not necessarily limited to, all of the following: <br /> (a) excavation for bridge's foundation <br /> (b) installation of bridge's piles <br /> <br />F:Atty2001Shared/Redwood/Coun cil/AgmlJAgmt-508 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.