Laserfiche WebLink
■ Follow-up with key stakeholders as needed — project staff will follow-up with key stakeholders via <br /> phone once each <br /> ■ Revise materials as needed — as the project progresses, information materials will be updated once <br /> (but changes are assumed to be minor) <br /> Task 3. Prepare Environmenfal Checktist <br /> The applicant has prepared the following technical studies, which will be used by ICF as <br /> supporting documentation for the environmental analysis: <br /> ■ Air Quality and Greenhouse Gas Analysis <br /> ■ Preliminary Transportation Assessment Memorandum (Kittelson & Associates, Inc) <br /> This task involves preparation of an analysis based on prior documentation and which will include an <br /> evaluation of the environmental resources contained in the CEQA Environmental Checklist. The analysis <br /> will include discussion of the existing conditions, impacts and magnitude of the impacts, and the level of <br /> significance for each environmental discipline, as appropriate. <br /> Due to the scale and location of the proposed project, ICF anticipates that air quality, <br /> greenhouse gas, noise, and traffic analyses will be the primary areas of concern. IT is <br /> assumed that the technical studies from the applicant provide adequately detailed and <br /> comprehensive quantitative data required by our resource specialists including a <br /> quantitative assessment of construction emissions (including criteria pollutants, toxic air <br /> contaminants, and greenhouse gas emissions) and a cumulative Health Risk <br /> Assessment based on current BAAQMD guidelines to support our impact discussio� of <br /> air quality and climate change in the CEQA document. Information from previous <br /> environmental documentation will be used to the maximum extent possible to support <br /> our conclusions. <br /> Qualitative analyses and professional judgment based on a review of existing <br /> documentation will be used in the preparation of all environmental impact discussions <br /> other than air quality, noise and traffic impacts analyses. Based on the results of the <br /> environmental analyses ICF inay identify project engineering features or best <br /> ATTY/AGR/2012.018/ICF INTERNATIONAL COSTCO REVIEW VR EDITS AND COMMENTS <br /> REV:o2-21-12 13 <br /> City Attomey Approved Version 012611 <br />