My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 ICF Jones & Stokes, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 ICF Jones & Stokes, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2012 12:17:43 PM
Creation date
3/12/2012 12:17:42 PM
Metadata
Fields
Template:
Agreement
Contractor Name
ICF Jones & Stokes, Inc.
PROJECT NAME
CEQA Study- Costco Review
RMP File Number
304.5
Date
3/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■ Follow-up with key stakeholders as needed — project staff will follow-up with key stakeholders via <br /> phone once each <br /> ■ Revise materials as needed — as the project progresses, information materials will be updated once <br /> (but changes are assumed to be minor) <br /> Task 3. Prepare Environmenfal Checktist <br /> The applicant has prepared the following technical studies, which will be used by ICF as <br /> supporting documentation for the environmental analysis: <br /> ■ Air Quality and Greenhouse Gas Analysis <br /> ■ Preliminary Transportation Assessment Memorandum (Kittelson & Associates, Inc) <br /> This task involves preparation of an analysis based on prior documentation and which will include an <br /> evaluation of the environmental resources contained in the CEQA Environmental Checklist. The analysis <br /> will include discussion of the existing conditions, impacts and magnitude of the impacts, and the level of <br /> significance for each environmental discipline, as appropriate. <br /> Due to the scale and location of the proposed project, ICF anticipates that air quality, <br /> greenhouse gas, noise, and traffic analyses will be the primary areas of concern. IT is <br /> assumed that the technical studies from the applicant provide adequately detailed and <br /> comprehensive quantitative data required by our resource specialists including a <br /> quantitative assessment of construction emissions (including criteria pollutants, toxic air <br /> contaminants, and greenhouse gas emissions) and a cumulative Health Risk <br /> Assessment based on current BAAQMD guidelines to support our impact discussio� of <br /> air quality and climate change in the CEQA document. Information from previous <br /> environmental documentation will be used to the maximum extent possible to support <br /> our conclusions. <br /> Qualitative analyses and professional judgment based on a review of existing <br /> documentation will be used in the preparation of all environmental impact discussions <br /> other than air quality, noise and traffic impacts analyses. Based on the results of the <br /> environmental analyses ICF inay identify project engineering features or best <br /> ATTY/AGR/2012.018/ICF INTERNATIONAL COSTCO REVIEW VR EDITS AND COMMENTS <br /> REV:o2-21-12 13 <br /> City Attomey Approved Version 012611 <br />
The URL can be used to link to this page
Your browser does not support the video tag.