My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Camp Dresser & McKee (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Under $60K
>
Agmt03 Camp Dresser & McKee (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2008 3:42:38 PM
Creation date
10/31/2003 9:26:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Camp Dresser & McKee
PROJECT NAME
engineering services
RMP File Number
304.5
Date
10/16/2003
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Chu Chang <br />August 19, 2003 <br />Page 3 <br /> <br />establishing the replacement schedule. CDM will also prioritize facility improvements to <br />include meeting any future regulatory goals. <br /> <br />Task 5 - O & M Manual - CDM will prepare a operation and maintenance manual for the <br />primary facilities and dewatering structures that will describe the plan and will include: <br /> <br />· The existing frequency of maintenance by the City staff. <br />· The type of maintenance that is currently being performed. <br />· Recommended actions to be taken to increase the level of maintenance. <br />· Recommended procedure for monitoring that can be used to help schedule pump <br /> operation to minimize power costs. <br />· Operation and maintenance staffing needs. <br /> <br />The results of Task 1 through 4 will be presented as an attachment to the manual. The <br />manual will have approximately 20 pages. Three draft copies will be provided to the City for <br />review. Following receipt of comments from the City, the manual will be finalized and 10 <br />copies will be submitted to the City. <br /> <br />ADDITIONAL SERVICES <br />CDM is available to provide additional services that could include: <br /> <br />· For the secondary facilities at Redwood Shores Lagoon: perform a condition assessment, <br /> formulate a preventative maintenance program, and work with the City staff to develop a <br /> replacement schedule. <br /> <br />· Formulate an emergency response sanitary sewer spill response plan. <br /> <br />SCHEDULE <br />We will perform the Task 1 inspection with the City staff during September 2003, based upon <br />receipt of authorization by the end of August 2003. We will endeavor to complete Tasks 1, 2, 3 <br />and 4 within three months if meetings with City staff can be conveniently arranged. The Task <br />5 technical memorandum can be completed within three weeks following the completion of <br />Task 4. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.