My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Bay Area Geotechnical Gr
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Under $60K
>
Agmt03 Bay Area Geotechnical Gr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2008 3:03:40 PM
Creation date
10/31/2003 9:32:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Geotechnical Group
PROJECT NAME
Westpoint Marina project
RMP File Number
304.5
Date
10/22/2003
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Review soil cmgincc~ng and geologic information pertaining to thc site and vicinity, <br /> as contained in our files. <br /> <br /> 2. Review the soil intbrmation contained in the subject repons, including the boring <br /> logs and laboratory test results. <br /> <br /> 3. Visit the site to observe existing conditions with respect to the expected soil and <br /> environmental conditions. <br /> <br /> 4. Pertbrm very limited engineering analyses based on the above data to verify the <br /> accuracy of the analyses presented in the reports, and develop conclusions and <br /> opinions regarding: <br /> · the completeness of the investigation pertbrmed <br /> · the accuracy ofthe engineering evaluations perfi)rmed <br /> · the applicability of the Consultant's conclusions, opinions, and <br /> recommendations for the project as described on the plans <br /> <br /> 5. Present the results of our services in a short letter report. <br /> <br />We anticipate it will require our Principal Engineer approximately 24 hours to perform these tasks. <br />With incidental charges for clerical, etc. we estimate the above scope of services can be provided for <br />a total fee of $2,850. This fee would not be exceeded without prior consultation and negotiations <br />regarding a change in the scope of work outlined in this proposal. This fee also does not include a <br />review of a revised or modified report, should they become necessary, and does not include review <br />of any construction drawings: <br /> <br />If tl-ds proposal if acceptable, we anticipate we will be able to complete the above scope of work <br />Within about 7 calender days after receiving authorization to proceed. <br /> <br />Thank you fbr the oply~)rtunity to sUbmit this proposal. If the content of this proposal meets your <br />approval, please provide written authorization for us to proceed, and we will start scheduling the <br />work as soon as possible. <br /> <br /> Sincerely, <br /> BAY AREA GEOTECHN!CAL GROUP <br /> <br /> Jason Van Z'-''~ -' -wol~. <br /> CA Geotechnicdl Engineer ~g54 <br />2 copies submitted~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.