My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-04-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-04-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:45:24 PM
Creation date
4/10/2012 3:06:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
4/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3. B. - Page 8 <br /> F. Caltrans District 4("Caltrans"), who shall have fi�ll access to the Project equipment <br /> throughout the Project limits but is not a signatory to this Agreement, shall enter into a <br /> separate agreement with C/CAG for the construction of portions of the Project on State <br /> right of way and the maintenance and operations of the Project (the "GCAG-Caltrans <br /> Agreement"). <br /> G. The COUNTY shall enter into a separate agreement with GCAG with regard to the <br /> construction of portions of the Project on local arterials (tlie "C/CAG-COUNTY <br /> Agreement"). <br /> AGREEMENT <br /> The parties hereto agree as follows: <br /> 1. Conditions Precedent to Effectiveness of Agreement <br /> Tlus Agreement shall become effective and binding upon the parties only if and once the <br /> C/CAG-Caltrans Agreement and the C/CAG-COLTNTY Agreement are entered into. <br /> 2. Equipment <br /> A. New Equipment: <br /> The COUNTY shall install the following equipment and components of the new Intelligent <br /> Transportation System (ITS) the Project elemei7ts ("New Equipment"): <br /> 1) Directional signs (trailblazers and other); <br /> 2) Fixed or pan-tilt-zoom (PTZ) closed-circuit television cameras (CGTV); <br /> 3) Coinmunications infrastructure (conduit, fiber, twisted wire copper, pull boxes, <br /> splice enclosures, wireless, software, and associated equipinent); <br /> 4) Arterial changeable message signs (Arterial Dynamic Message Signs — <br /> ADMS); <br /> 5) Vehicle detection systems; <br /> 6) Center-to-center cominuiucations equipment between San Mateo County Hub <br /> (SMCHub) and District 4 Traffic Management Center (D4TMC); and <br /> 7) Power supply line and equipinent. <br /> B. Upgraded Equipinent. <br /> The GOLTNTY may upgrade the following equipment to the satisfaction of Redwood Gity, if <br /> necessary, to meet the operational needs of the Project ("Upgraded Equipment"): traffic signal <br /> controllers, cabinets, signal interconnect equipment, and signal operating software systeins. <br /> C. Summary of Project Equipment. <br /> ATTY/AGR/2012.025/SMART CORRIDORS CCAG <br /> REV:03-15-12 VR <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.