My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-04-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 3:14:08 PM
Creation date
4/19/2012 5:48:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
4/23/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. B. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> April 23, 2012 <br /> SUBJECT <br /> General services agreement for closed-circuit television cleaning and inspection of <br /> selected sanitary sewer mains <br /> RECOMMENDATION <br /> Approve, by motion, the standard form general services agreement with Advanced <br /> Sewer Technologies of Los Angeles, CA to provide closed circuit television ("CCTV") <br /> inspection services of sanitary sewer pipelines for an amount not to exceed $81,016.64 <br /> and authorize the City Manager to increase the contract amount up to 10% if necessary. <br /> BACKGROUND <br /> The city annually replaces or upgrades aging and deficient sections of the sanitary <br /> sewer collection system. In preparation for this annual replacement/rehabilitation <br /> project, CCTV inspections are conducted to evaluate the condition of the pipeline. <br /> Knowing the actual condition of the pipeline allows staff to choose the most cost <br /> effective repair method. <br /> The city has a total of 192 miles of sewer pipelines in its service area, which is divided <br /> into eighteen sewer basins. Since the CCTV program started in 2007, the city has <br /> completed CCTV inspections of seven (7) basins, totaling approximately 306,745 lineal <br /> feet or 58 miles. Critical sewer pipeline segments with significant defects such as <br /> cracks, offset joints, and root intrusions were replaced to reduce the potential of sanitary <br /> sewer overflows. The overall goal is to conduct CCTV inspections of all sewer pipelines <br /> in the collection system by 2019. <br /> ANALYSIS <br /> City's staff submitted Request for Proposal (RFP) to two qualified firms that use <br /> WinCAN CCTV software. The City received one proposal for the project. After <br /> reviewing the proposal from Advanced Sewer Technologies and evaluating the firm's <br /> qualifications, references and experience, staff has selected Advanced Sewer <br /> Technologies to perform this year's CCTV inspection in the three areas identified below. <br /> Advanced Sewer Technologies satisfactorily performed similar services for various city <br /> agencies throughout California. Advanced Sewer Technologies uses "WinCAN", a <br /> specific CCTV software that the city possesses. <br /> 1. Sanitary Sewer Basin No. 4— approximately bordered by Hopkins Avenue, Brewster <br /> Avenue, EI Camino Real, Stanley Street, Nevada Street and Harding Avenue. <br /> 2. Sanitary Sewer Basin No. 5C — approximately bordered by Harrison Avenue, EI <br /> Camino Real, Vera Avenue and Hudson Street. <br />
The URL can be used to link to this page
Your browser does not support the video tag.