Laserfiche WebLink
EXHIBIT "A" <br /> PROJECT DESCRIPTION <br /> Consultant shall prepare plans, specifications, and estimates (PS&E) for the Brewster Avenue <br /> Bicycle Improvements project in Redwood City. <br /> The proposed project includes installation of bicycle facilities on Brewster Avenue between EI <br /> Camino Real and Alameda de las Pulgas, and on Broadway between Brewster Avenue and EI <br /> Camino Real, a total length of approximately 1.2 miles. The proposed facilities include new <br /> Class II bike lanes along Brewster Avenue between Broadway and Elwood Street and on <br /> Broadway between Brewster Avenue and Arch Street. Along Brewster Avenue between Elwood <br /> Street and Alameda de las Pulgas, pavement markings and bike route signage will be installed <br /> to clearly designate a Class III bi ke route. New bike-sensitive detectors and pavem ent markings <br /> will also be installed at the signalized Brewster Avenue/Broadway intersection. Potential <br /> alternative parking and lane configurations to accommodate bicycles on Broadway between <br /> Arch Street and EI Camino Real and on Brewster Avenue between Broadway and EI Camino <br /> Real, as well as modification of the curb bulb-out at the Broadway/EI Camino Real northwest <br /> corner, are to be investigated, and will be installed if appropriate. The installation of bike lanes, <br /> pavement markings, signage, and bike detectors will promote safety for both bike riders and <br /> vehicle traffic on Brewster Avenue, which along with added convenience for bicyclists, will <br /> encourage more bicycle use in the area. <br /> SCOPE OF WORK <br /> Consultant shall perform the following tasks: <br /> Task 1— Develop Alternative Concepts — Between Broadway/Brewsterand E/ Camino <br /> Real <br /> a. Schedule a meeting with City of Redwood City staff for project kick-off within one week <br /> of Notice to Proceed. <br /> b. Develop conceptual drawings of up to three alternative parking and lane configurations <br /> to accommodate bicycles on Broadway between Arch Street and EI Camino Real and on <br /> Brewster Avenue between Broadway and EI Camino Real. <br /> c. Develop conceptual plans for modification to the curb bulb-out at the northwest corner of <br /> Broadway/El Camino Real. Using the as-built information, Consultant shall determine <br /> the feasibility of modifying the existing bulb-out so that the travel lane can be improved <br /> to accommodate bicycles, including an alternative configuration that would avoid <br /> relocating signal equipm ent. <br /> d. Transmit conceptual alternative drawings to City staff for review and comment. <br /> Consultant shall discuss the advantages and disadvantages of the alternative concepts <br /> with City staff to facilitate selection of preferred alternatives for inclusion in the design <br /> PS&E. <br /> Deliverables: (Due within four weeks of Notice to Proceed) <br /> Conceptual drawings of up to three alternative configurations for Broadway between <br /> Arch Street and EI Camino Real and Brewster Avenue between Broadway and EI <br /> ATTY/AGR/2012.033rf JKM 10 <br /> REV:03-29-12 VR <br />