My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 TJKM Transportation Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 TJKM Transportation Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2012 3:09:23 PM
Creation date
5/2/2012 3:08:49 PM
Metadata
Fields
Template:
Agreement
Contractor Name
TJKM Transportation Consultants
PROJECT NAME
Design Professional Consultants-Brewster Ave Bicycle Imoprovements
RMP File Number
304.5
Date
4/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hardcopy of final plans, specifications, and construction cost estimate, original mylar set <br /> of plans and specifications signed and sealed by the registered civil engineer, and an <br /> electronic version of the plans, specifications, and estimate. <br /> Task 4— Bidding and Construction Supp ort Phase <br /> a. Respond to contractor bid questions and requests for information/clarification (RFI) <br /> regarding the design and/or construction documents, as needed. <br /> b. Attend pre-construction meeting, if requested by the City. <br /> c. Respond to contractor's requests f or information (RFI), as needed. <br /> d. Attend meetings to answer design questions and clarify design elements, if requested by <br /> the City. <br /> e. Prepare as-built drawings from City/Contractor redlined as-builts and submit <br /> reproducible mylar set of plans and compact disk with electronic files. <br /> Deliverables: As needed, responses to requests for information during the bidding <br /> process and construction. Mylar set of as-built plans based on City/Contractor redlined <br /> as-builts and an electronic version of the as-builts. <br /> Consultant shall perform scope of work for a set fee of $22,455.00. Consultant shall invoice <br /> monthly on a percent-completed basis and as detailed in the table below. <br /> , , <br /> $ $ <br /> Hourly Rate 190.00 160.00 $ 130.00 TOTALS <br /> TASKS Hours Hours Hours Hours Cost <br /> Task l: Alternative Concepu 8 8 16 32 $ 4,880 <br /> Task 2: 90% PS&E 10 12 30 52 7,720 <br /> Task 3: 100% PS&E 5 8 10 23 3,530 <br /> Task 4: Bid and Construction Support - 4 4 8 I, I 60 <br /> Subtotal 23 32 60 115 17,290 <br /> Expenses 5, I 65 <br /> TOTAL $ 22,455 <br /> ATTY/AGR/2012.033lTJKM 12 <br /> REV:03-29-12 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.