Laserfiche WebLink
EXHIBIT "B" <br /> FEE SCHEDULE <br /> Compensation will be made on a time and materials, not to exceed basis for the Project Totals as broken <br /> down in the following table. The overall effort will not exceed the total project upper limit as shown below. <br /> Invoices shall be based on the CONSULTANT Rate Schedule in effect at the time services are <br /> performed. The current CONSULTANT Rate Schedule is attached. <br /> Labor Labor Other Direct <br /> Description Hours Budget Costs/Outside Total Task Cost <br /> Professionals <br /> Task 1- Pro ect Mana ement 62 $ 9, 020 $800 $9, 820 <br /> Task 2- Preliminary Design 97 $13,300 $150 $13,450 <br /> 60% <br /> Task 3- Final Desi n 100% 132 $17,800 $600 $18,400 <br /> Task 4— Bid Support and �26 $16,100 $350/$11, 000 (Note 1) $27,450 <br /> Construction Services <br /> Project Upper Limit 407 $56,220 $1,900/$11,000 $69,120 <br /> Note: <br /> Outside professional costs include an allowance for control system programming as described in the <br /> Project scope of work <br /> Schedule of Hourlv Rates and Costs <br /> Labor <br /> Engineer <br /> Level 10 (E10) $193.00/hour <br /> Level 9 (E9) $183.00/hour <br /> Level 8 (E8) $169.00/hour <br /> Level 7 (E7) $166.00/hour <br /> Level 6 (E6) $162.00/hour <br /> Level 5 (E5) $155.00/hour <br /> Level 4 (E4) $148.00/hour <br /> Level 3 (E3) $134.00/hour <br /> Level 2 (E2) $118.00/hour <br /> Level 1 (E1) $104.00/hour <br /> Drafting <br /> Level 7 (C7) $145.00/hour <br /> Level 6 (C6) $126.00/hour <br /> Level 5 (C5) $116.00/hour <br /> Level 4 (C4) $106.00/hour <br /> Level 3 (C3) $91.00/hour <br /> Level 2 (C2) $77.00/hour <br /> Level 1 (C 1) $60.00/hour <br /> Administrative <br /> Level 10 (A10) $183.00/hour <br /> ATTYlAGR/2012.032lTJCAA <br /> REV:03-22-12 VR <br /> Page 14 of 76 <br />